Solid Radioactive Waste Strategy Report.pdf - UK EPR
Solid Radioactive Waste Strategy Report.pdf - UK EPR
Solid Radioactive Waste Strategy Report.pdf - UK EPR
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>EPR</strong> <strong>UK</strong><br />
N° NESH-G/2008/en/0123<br />
REV. A PAGE 95 / 257<br />
Power and Operating History<br />
This <strong>EPR</strong> operating programme assumed for the activation calculations is as follows:<br />
· 38 operating fuel cycles of 18 months (100% nominal power) followed by plant<br />
shutdown of 16 days;<br />
· A longer plant shutdown is considered every 10 years (40 days);<br />
· The total operating time is 60 years;<br />
· The thermal power is 4500 MWth.<br />
Activation Results<br />
Steels<br />
Based on the results of the activation calculations, steels have been grouped into three<br />
families of ILW dependent on activity levels:<br />
· The most activated:<br />
o Neutron shield and lower support plate;<br />
o Specific activity associated with 60 Co ~ 2.1E+9 Bq/g for raw waste 5 years 3<br />
after shutdown.<br />
· The intermediate activated:<br />
o<br />
o<br />
Core barrel, upper core plate, flow distribution device and upper support<br />
columns (which are located under the upper support plate);<br />
Specific activity associated with 60 Co ~ 3.6E+8 Bq/g for raw waste 5 years<br />
after shutdown.<br />
· The less activated:<br />
o<br />
o<br />
Pressure vessel + cladding (in the active region of the fuel assemblies);<br />
Specific activity with 60 Co ~ 2.8E+5 Bq/g for raw waste 5 years after<br />
shutdown.<br />
All other internal structures, namely the upper support columns (above upper support plate),<br />
the upper support plate, the upper support assembly, the pressure vessel (upper and lower<br />
fuel assemblies) and vessel cladding (upper and lower fuel assemblies) will be classified as<br />
LLW at the time of production.<br />
Concrete<br />
It is predicted that the following categories of waste will be generated for the reactor pit:<br />
· 5 years after shutdown:<br />
o<br />
o<br />
o<br />
60 cm depth of concrete is ILW;<br />
Then 90 cm depth is LLW;<br />
The remainder is VLLW.<br />
· 40 years after shutdown:<br />
o 80 cm depth is LLW;<br />
3 Based on 60 years of electricity production for an <strong>EPR</strong> followed by an assumption of<br />
immediate dismantling of a single reactor, the ILW resins (from primary circuit<br />
decontamination) are produced in year 61 and ILW solid dismantling wastes between years<br />
67 and 70. Therefore, 5 years after shutdown has been chosen to evaluate conservative<br />
radiological characteristics.