<strong>EPR</strong> <strong>UK</strong><br />

N° NESH-G/2008/en/0123<br />

REV. A PAGE 29 / 257<br />

This Licence Condition requires that the licensee shall ensure, so far as is reasonably<br />

practicable, that radioactive material and radioactive waste on the site is at all times adequately<br />

controlled or contained so that it cannot leak or otherwise escape from the containment and that<br />

in the event of any fault or accident which results in a leak or escape, there are adequate means<br />

for detecting the leak and reporting the incident to the HSE.<br />

3.4.4 Safety Assessment Principles<br />

The NII provides guidance to its inspectors on the assessment of safety cases in their Safety<br />

Assessment Principles (SAPs) [Ref.11]. The SAPs relating to radioactive waste are as follows:<br />

· A strategy should be produced and implemented for the management of<br />

radioactive waste on a site (RW.1);<br />

· The generation of radioactive waste should be prevented or, where this is not<br />

reasonably practicable, minimised in terms of quantity and activity (RW.2);<br />

· The accumulation of radioactive waste should be minimised (RW.3);<br />

· <strong>Radioactive</strong> waste should be characterised and segregated to facilitate<br />

subsequent safe and effective management (RW.4);<br />

· <strong>Radioactive</strong> waste should be processed into a passively safe state as soon as is<br />

reasonably practicable (RW.6);<br />

· <strong>Radioactive</strong> waste should be stored in accordance with good engineering practice<br />

and in a passively safe condition (RW.5);<br />

· Information that might be required now and in the future for the safe management<br />

of radioactive waste should be recorded and preserved (RW.7).<br />

The SAPs also contain decommissioning principles. These reflect the regulatory expectation<br />

that decommissioning should be taken into account throughout all stages of the design and<br />

operation of nuclear plant. The decommissioning principles are as follows:<br />

· Facilities should be designed and operated so that they can be safely<br />

decommissioned (DC.1);<br />

· A decommissioning strategy should be prepared and maintained for each site and<br />

should be integrated with other relevant strategies (DC.2);<br />

· Decommissioning should be carried out as soon as is reasonably practicable<br />

taking relevant factors into account (DC.3);<br />

· A decommissioning plan and programme should be prepared and maintained for<br />

each nuclear facility throughout its lifecycle to demonstrate that it can be safely<br />

decommissioned (DC.4);<br />

· The facility should be made passively safe before entering a care and maintenance<br />

phase (DC.5) 2 ;<br />

2 BERR guidance indicates that immediate decommissioning is preferred. The <strong>EPR</strong> reactor can be<br />

decommissioned over a period of twelve years immediately following shutdown with an assumed 40-<br />

year safe interim storage of packaged wastes. Each utility will develop their own decommissioning<br />

programme.