<strong>EPR</strong> <strong>UK</strong><br />

N° NESH-G/2008/en/0123<br />

REV. A PAGE 25 / 257<br />

Table 1: Possible <strong>EPR</strong> <strong>Waste</strong> <strong>Strategy</strong> Lifecycle<br />

Activity<br />

Year<br />

Reactor Operation (60 years)<br />

Start of <strong>EPR</strong> 0<br />

Shutdown of <strong>EPR</strong><br />

+60 (assuming no life<br />

extension)<br />

First operational waste processed +1<br />

Last operational waste processed +61<br />

First fuel discharge to pool +1.5<br />

Last fuel discharge to pool +60<br />

Reactor Decommissioning (12 years)<br />

Decontamination of primary circuit +61<br />

Dismantling of Nuclear Island +66 to +72<br />

Dismantling of primary circuits +66 to +70<br />

End of decommissioning +72<br />

ILW Interim Storage Facility (100 years)<br />

Start of operation +1<br />

End of operation +100<br />

First ILW package to facility +1<br />

Last ILW package to facility +70<br />

Last ILW package to leave facility for disposal +100<br />

Spent fuel Interim Storage Facility (100 years)<br />

Start of operation +10<br />

End of operation +100<br />

First spent fuel assembly to facility +10<br />

Last spent fuel assembly to facility +70<br />

Last spent fuel assemblies to leave ISF for disposal +100<br />

Geological Disposal Facility available +100