<strong>EPR</strong> <strong>UK</strong><br />

N° NESH-G/2008/en/0123<br />

REV. A PAGE 37 / 257<br />

6 OPERATIONAL WASTE CHARACTERISTICS<br />

6.1 Introduction<br />

During the operation of the <strong>UK</strong> <strong>EPR</strong>, waste streams will be generated. Liquid effluent generated<br />

during the operation of the <strong>UK</strong> <strong>EPR</strong> will be treated to generate a clean discharge. The<br />

treatment of liquid effluent will generate solid waste as a by product. For completeness this<br />

waste is included below.<br />

In this section these waste streams are documented in terms of estimated total quantities and<br />

annual arisings. The physical, chemical and radiological characterisation is presented.<br />

6.2 <strong>Waste</strong> Characterisation Methodology<br />

The waste streams that will be generated from operation of a <strong>UK</strong> <strong>EPR</strong> have been characterised<br />

by EdF by examining the waste arisings from several operating French reactors. These are<br />

expected values and variations in their absolute accuracy does not effect the content of this<br />

strategy.<br />

6.3 Summary of Operational <strong>Waste</strong> Arisings<br />

The <strong>UK</strong> <strong>EPR</strong> will generate operational wastes that will be classified as ILW or LLW based on<br />

beta-gamma activity only. Table 2 shows a summary of the expected waste arisings from the<br />

<strong>UK</strong> <strong>EPR</strong>. Figure 2 and Figure 3 illustrate the percentage make-up of the wastes when<br />

segregated into LLW and ILW arisings.<br />

TABLE 2: SUMMARY OF RAW WASTE ARISINGS FROM OPERATION OF A <strong>UK</strong> <strong>EPR</strong><br />

<strong>Waste</strong> Stream<br />

<strong>Waste</strong><br />

Classification at<br />

Time of Production<br />

Annual Rate of<br />

Production<br />

m 3 / year<br />

Total Volume Expected<br />

Over Operational Phase<br />

of <strong>EPR</strong><br />

m 3<br />

Ion Exchange Resins ILW 3 180<br />

Spent Filters ILW / LLW 5 300<br />

Dry Active <strong>Waste</strong> ILW/LLW 51 3060<br />

Tank Sludges ILW / LLW 1 60<br />

Evaporator<br />

LLW 3 180<br />

Concentrates<br />

Low Activity Resins VLLW 7.5 450<br />

Air and Water Filters LLW 4 240<br />

Oils LLW 2 120<br />

Metal Maintenance<br />

LLW/VLLW 6 360<br />

<strong>Waste</strong><br />

Total (m 3 ) - 82.5 4950