16.01.2015 Views

Solid Radioactive Waste Strategy Report.pdf - UK EPR

Solid Radioactive Waste Strategy Report.pdf - UK EPR

Solid Radioactive Waste Strategy Report.pdf - UK EPR

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>EPR</strong> <strong>UK</strong><br />

N° NESH-G/2008/en/0123<br />

REV. A PAGE 173 / 257<br />

The additional waste management functions that will be performed by the waste treatment<br />

building will include:<br />

· Shipping and receiving areas;<br />

· Effluent monitoring;<br />

· <strong>Waste</strong> container monitoring;<br />

· Contamination monitoring and survey;<br />

· Controlled clearance of solid waste;<br />

· Decontamination System;<br />

· Active Laundry;<br />

· Transfer Station(s);<br />

· Hot workshop<br />

To support operations in the WTB the following auxiliary systems will be provided:<br />

· Cranes, hoists;<br />

· HVAC;<br />

· Cooling, Chilled Water;<br />

· Demineralised water;<br />

· Compressed air;<br />

· Electricity.<br />

The treatment and conditioning systems are installed in three main building sections that are<br />

connected to the buffer area, as shown in Figure 65.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!