30.01.2015 Views

Medspiration – System Requirements Document - Data User Element

Medspiration – System Requirements Document - Data User Element

Medspiration – System Requirements Document - Data User Element

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Medspiration</strong> MED-SOC-RS-001_1<br />

<strong>System</strong> <strong>Requirements</strong> <strong>Document</strong> Issue F<br />

Page Table, fig. Reference ID Text from reference documents<br />

SR entry<br />

72 Rule<br />

WP3-059<br />

A minimum delay of 24 hours is to be expected when using data from operational in situ data centres due to the latency<br />

MDB.0030<br />

3.1.2e<br />

incurred by QC procedures<br />

72 Rule<br />

WP3-060 all MDB records are admissible irrespective of their timeliness for use by the GHRSST-PP reanalysis project MDB.0030<br />

3.1.2e<br />

72 Rule<br />

WP3-061<br />

Additional geophysical fields will be required to provide insight into any uncorrected perturbations to the SSTs which might<br />

MDB.0330<br />

3.1.2f<br />

result in systematic errors. All available in situ parameters should be included in the MDB record using the spare<br />

WP-ID3.1.2 Format of MDB record<br />

72 WP3-062 Each in situ SST matched to a near contemporaneous satellite SST will be formatted as an XML text file following the<br />

Format<br />

format described in Appendix A4.<br />

WP-ID3.1.3 Insert MDB record into the GHRSST-PP MDB system<br />

72 WP3-063 MDB data records should be sent to the GHRSST-PP MDB either as an e-mail message or via ftp put CTR.0580<br />

72 WP3-064 An error message will be returned to the data provider if the MDB record is incorrectly formatted. NASR<br />

WP-ID3.2: Derivation of SSES using MDB records<br />

78<br />

72-<br />

79-<br />

WP-ID3.3: Publish SSES on GHRSST-PP web site and inform RDAC/GDAC<br />

80<br />

WP-ID4: Generation of L4 Analysed data products (L4)<br />

Description<br />

81 WP4-001 The GDS will produce an analysed estimate of SSTfnd every 24 hours using analysis procedures that depend on L2P data<br />

SYS.0080<br />

products as input.<br />

© 2004 SOC Page 164 of 193

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!