10.07.2015 Views

Prospectus re Admission to the Official List - Heritage Oil

Prospectus re Admission to the Official List - Heritage Oil

Prospectus re Admission to the Official List - Heritage Oil

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART V—OPERATING AND FINANCIAL REVIEWThe following discussion and analysis is intended <strong>to</strong> assist in <strong>the</strong> understanding and assessment of <strong>the</strong> t<strong>re</strong>ndsand significant changes in <strong>the</strong> Group’s <strong>re</strong>sults of operations and financial condition. His<strong>to</strong>rical <strong>re</strong>sults may notbe indicative of futu<strong>re</strong> financial performance. Forward-looking statements contained in this <strong>re</strong>view that <strong>re</strong>flect<strong>the</strong> cur<strong>re</strong>nt view of management involves risks and uncertainties and a<strong>re</strong> subject <strong>to</strong> a variety of fac<strong>to</strong>rs that couldcause actual <strong>re</strong>sults <strong>to</strong> differ materially from those contemplated by such statements. Fac<strong>to</strong>rs that may causesuch a diffe<strong>re</strong>nce include, but a<strong>re</strong> not limited <strong>to</strong>, those discussed in ‘‘Forward-Looking Statements’’ and ‘‘RiskFac<strong>to</strong>rs’’. In this document <strong>the</strong> consolidated financial statements p<strong>re</strong>sented a<strong>re</strong> those of <strong>the</strong> Group. Thisdiscussion is based on <strong>the</strong> consolidated financial statements of <strong>the</strong> Group and should be <strong>re</strong>ad in conjunctionwith its consolidated financial statements and <strong>the</strong> accompanying notes contained in Part VI ‘‘FinancialInformation’’ and with <strong>the</strong> information <strong>re</strong>lating <strong>to</strong> <strong>the</strong> business of <strong>the</strong> Group included elsewhe<strong>re</strong> in thisdocument. Unless o<strong>the</strong>rwise indicated, all of <strong>the</strong> financial data and discussions <strong>the</strong><strong>re</strong>of a<strong>re</strong> based upon financialstatements p<strong>re</strong>pa<strong>re</strong>d in accordance with IFRS. Inves<strong>to</strong>rs should <strong>re</strong>ad <strong>the</strong> whole of this document and not <strong>re</strong>lyjust on summarised information.1. OVERVIEWThe Company was incorporated on 6 February 2008. The Group was established in 1992 (with HOC beingincorporated on 30 Oc<strong>to</strong>ber 1996) and commenced trading in <strong>the</strong> mid-1990s as an independent upst<strong>re</strong>amexploration and production group engaged in <strong>the</strong> exploration for, and <strong>the</strong> development, production andacquisition of, oil and gas inte<strong>re</strong>sts in Africa, <strong>the</strong> Middle East, Russia and <strong>the</strong> Mediterranean. The Grouphas producing properties in Oman and Russia and exploration projects in Uganda, <strong>the</strong> KRI, <strong>the</strong> DRC,Malta, Pakistan and Mali.RussiaThe Group has a 95 per cent. inte<strong>re</strong>st in a development project <strong>the</strong> Zapadno Chumpasskoye licence inRussia, which has proved and probable <strong>re</strong>serves of 60.5 million bbls net <strong>to</strong> <strong>the</strong> Group. Productioncommenced in May 2007, through well 226, which flowed clean oil typically between 300 and 400 bopd.Th<strong>re</strong>e wells have since been drilled of which one has been brought in<strong>to</strong> production. Production averaged342 bopd in February 2008. Planning of <strong>the</strong> design and specification of <strong>the</strong> field development facilitiesis ongoing.OmanThe Group has a 10 per cent. working inte<strong>re</strong>st in Block 8 in Oman. Block 8 includes Bukha, a producinggas-condensate field and West Bukha, an approved oil and gas development. In <strong>the</strong> last quarter of 2006,<strong>the</strong> West Bukha-2 development well test produced a combined flow-rate from <strong>the</strong> zones tested (Ilam/Mishrif/Mauddud and Thamama) of approximately 12,750 bopd and 26 MMscf/d and it is proposed <strong>to</strong><strong>re</strong>-enter and complete it as a producing well. The oil was light (approximately 42 o API). Development of<strong>the</strong> West Bukha field has commenced and comprises design, fabrication and installation of <strong>the</strong> wellheadplatform and pipeline. Production is targeted for <strong>the</strong> third quarter of 2008. The West Bukha-3 productionwell is planned <strong>to</strong> be drilled in mid-2008.UgandaThe Group is <strong>the</strong> opera<strong>to</strong>r and has a 50 per cent. inte<strong>re</strong>st in two exploration licences in Uganda (Blocks 3Aand 1). The Kingfisher deviated well in Block 3A was drilled <strong>to</strong> a <strong>to</strong>tal depth of 3,195 met<strong>re</strong>s. Drilling wascompleted in March 2007. Four intervals we<strong>re</strong> tested successfully in <strong>the</strong> Kingfisher well, <strong>re</strong>sulting in anoverall cumulative maximum flow rate of 13,893 bopd. The test produced quality light (between 30 and32 API) and sweet oils with a low gas-oil ratio and some associated wax. The sands<strong>to</strong>ne <strong>re</strong>servoirs exhibithigh permeability up <strong>to</strong> 3,000 milliDarcies. The Kingfisher-2 well is scheduled <strong>to</strong> spud in <strong>the</strong> first halfof 2008. Blocks 3A and 1 include minimum drilling and seismic commitments which <strong>the</strong> Group expects <strong>to</strong>achieve in 2008.DRCThe Group signed a PSC in <strong>the</strong> DRC in <strong>the</strong> summer of 2006 for a 39.5 per cent., non-operated inte<strong>re</strong>st inBlocks 1 and 2 covering over 6,000 squa<strong>re</strong> km of onsho<strong>re</strong> and offsho<strong>re</strong> ac<strong>re</strong>age in <strong>the</strong> DRC part of <strong>the</strong>Albert Basin. An exploration programme, <strong>the</strong> timing of which is uncertain, will only commence following ap<strong>re</strong>sidential dec<strong>re</strong>e ratifying <strong>the</strong> DRC PSC. The minimum work programme in <strong>the</strong> DRC PSC for <strong>the</strong> two136

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!