10.07.2015 Views

Prospectus re Admission to the Official List - Heritage Oil

Prospectus re Admission to the Official List - Heritage Oil

Prospectus re Admission to the Official List - Heritage Oil

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RPS Energy<strong>Heritage</strong> <strong>Oil</strong> – Competent Persons Reportmaps, but it is expected that faults will cut <strong>the</strong> sequence and offset <strong>the</strong> <strong>re</strong>latively thin (generally less than10m) sands. Due <strong>to</strong> <strong>the</strong> stratigraphic natu<strong>re</strong> of <strong>the</strong> trap, seismic interp<strong>re</strong>tation is not <strong>re</strong>garded as critical <strong>to</strong><strong>the</strong> volumetric evaluation.<strong>Heritage</strong>’s Net <strong>Oil</strong> Pay thickness maps we<strong>re</strong> <strong>re</strong>viewed and modified as appropriate including an estimate of<strong>the</strong> pinch out edge <strong>to</strong> <strong>the</strong> south (<strong>the</strong> exact position of this pinch out cannot be p<strong>re</strong>cisely located on <strong>the</strong>seismic). No definitive OWC has been identified, but possible fluid contacts we<strong>re</strong> picked at 2,702m TVDSS(deepest dry oil production in Well 226), 2,724m TVDSS (ODT in Well 943) and 2,756m TVDSS (possibleODT in Well 100). The Net <strong>Oil</strong> Pay thicknesses above each of <strong>the</strong>se contacts we<strong>re</strong> hand con<strong>to</strong>u<strong>re</strong>d,digitised and Net Pay Rock Volumes calculated. The p50 Net Pay Map is shown in Figu<strong>re</strong> 14.Figu<strong>re</strong> 14:Lower J 1 Sand—RPS Net Pay Map (p50 Case)21FEB2008231553204.2.3. PetrophysicsRPS under<strong>to</strong>ok an independent petrophysical <strong>re</strong>view of wells P2ST and P3. The S w values interp<strong>re</strong>ted fromwestern logs in Well P3 we<strong>re</strong> higher than expected. As a <strong>re</strong>sult a detailed <strong>re</strong>view of co<strong>re</strong> and water analysisdata derived from co<strong>re</strong> taken from Well P3 was undertaken. These data provided a basis for calibrating <strong>the</strong>logs from P2 ST and P3. Co<strong>re</strong> was taken from Well P3 whe<strong>re</strong> a water base mud was tagged with afluo<strong>re</strong>scent dye. The co<strong>re</strong> bar<strong>re</strong>l contained a glass fib<strong>re</strong> inner bar<strong>re</strong>l that was filled with depolarizedmineral oil. To obtain <strong>the</strong> background <strong>re</strong>ading of fluo<strong>re</strong>scent dye concentration, <strong>the</strong> tagged mud wassampled <strong>re</strong>gularly during coring. However, no fluo<strong>re</strong>scence was detected from <strong>the</strong> water extracted from <strong>the</strong>95

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!