11.07.2015 Views

Commuter Rail Extension Alternatives Analysis - Transportation ...

Commuter Rail Extension Alternatives Analysis - Transportation ...

Commuter Rail Extension Alternatives Analysis - Transportation ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CALTRAIN EXTENSION TO MONTEREY COUNTYALTERNATIVES ANALYSISTable 9-5Daily Caltrain <strong>Extension</strong> Transit Rider Equivalents Based on Trip Length (2004)Average Trip Trip Length Daily RiderMode/ServiceLength (miles) Ratio* Equivalent†Monterey County Caltrain <strong>Extension</strong>/Express Bus (2010) 74.2 1 2,056National<strong>Commuter</strong> rail 23.5 3.16 6,497Heavy rail 5.2 14.27 29,339Light rail 4.5 16.49 33,903Bus 3.7 20.05 41,223San Francisco Bay AreaCaltrain Peninsula Corridor Joint Powers Board (JPB) 20.07 3.70 7,607Altamont <strong>Commuter</strong> Express (ACE) 47.92 1.55 3,187Bay Area Rapid Transit (BART) 12.59 5.89 12,110Santa Clara Valley <strong>Transportation</strong> Authority (VTA) 4.42 16.79 34,520Source: 2004 National Transit Database, Parsons*Trip Length Ratio = Monterey County Average Trip Length ÷ Average Trip Length†Daily Rider Equivalent = Trip Length Ratio × Monterey County Daily Rider Equivalent2. Is the proposed fixed guideway investment cost effective?The benefit-cost analysis summarized above indicates that the Caltrain <strong>Extension</strong> Alternative iscost effective and yields life cycle benefits which nearly equal costs. The Express Bus Alternativeis one-tenth as cost effective. Table 9-6 compares ridership with annualized capital costs,operations and maintenance costs, and net public (subsidy) costs. Relative to other (national)transit fixed guideway investments, both the Caltrain <strong>Extension</strong> and Express Bus alternativesare cost effective ($10.29 to $24.03 of public investment per rider).Table 9-6Capital and Operating Costs per Rider and per Passenger MileCaltrain <strong>Extension</strong> AlternativeExpress Bus AlternativeParameter 2010 2030 2010 2030Annual ridership 524,280 1,001,130 524,280 1,001,130Annual passenger miles 38,903,565 74,642,682 38,903,565 74,642,682Annualized capital cost ($ 2007) $7,150,000 $7,905,137 $7,337,476 $9,226,006Annualized capital cost per rider $13.64 $7.90 $14.00 $9.22Annualized capital cost per passenger mile $0.184 $0.106 $0.189 $0.124Annual O&M cost ($ 2007) $4,485,680 $8,714,409 $8,566,7071 $17,133,413O&M cost per rider $8.56 $8.70 $16.34 $17.11O&M cost per passenger mile $0.115 $0.117 $0.220 $0.230Annual fare revenue $3,310,612 $6,320,790 $3,310,612 $6,320,790Annual net public operating cost $1,175,068 $2,393,619 $5,256,095 $10,812,623Net public operating cost per rider $2.24 $2.39 $10.03 $10.80Net public operating cost per passenger mile $0.030 $0.032 $0.135 $0.1453. Will the proposed fixed guideway investment equitably serve Monterey County residents?The proposed Caltrain <strong>Extension</strong> and the Express Bus alternatives will provide Monterey Countyresidents with public transportation access to relatively high paying jobs, colleges and universi-parsons CHAPTER 9: SUMMARY 226

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!