11.07.2015 Views

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Saticoy</strong> & <strong>Wells</strong> <strong>Community</strong> <strong>Plan</strong> and Code EIRSection 4.13 Public Servicesbe funded by the <strong>City</strong>’s general fund through tax revenues when available. As such, theconstruction of new facilities would not be required to effectively patrol the Project Area.The <strong>Community</strong> <strong>Plan</strong> includes policies and actions to deter crime in the Project Area.Policy 11QAction 11.7.4Action 11.7.5Develop a safety-by-design strategy that employs, where feasible, urbandesign techniques to reduce crime.Integrate features such as public visibility, night-time public use, lowlevellighting, or other prevention measures, into the design ofcommercial and public buildings in order to create a safe environment,particularly in mixed-use areas.As resources become available, add code enforcement personnel in orderto provide code enforcement in public places, recognizing the relationshipof crime to poorly maintained area.With funding from development fees and the <strong>City</strong>’s general fund and with implementation ofthe <strong>Community</strong> <strong>Plan</strong>’s policies and actions, police services would be able to effectively patrolthe Project Area without construction of new facilities. Impacts to police services would be lessthan significant.Mitigation Measures. No measures required so long as 2005 General <strong>Plan</strong> Action 7.15 isimplemented and development impact fees are collected concurrently with new development.Significance After Mitigation. Impacts would be less than significant withoutmitigation.Impact PS-3The Project would implement recommended circulationimprovements that would improve emergency access in the ProjectArea. This impact is considered beneficial (Class IV).The circulation system serving the Project Area does not currently provide adequate emergencyassess to all portions of the Project Area primarily because of narrow streets and an incompleteroadway network. The roadway system recommended by the Project will provide connectionsthrough areas that are currently underserved.Policy 11KAction 11.4.1Action 11.4.2Improve thoroughfare design and ensure that the circulation system isinterconnected and usable by all modes of transportation.Require street continuity and interconnectivity between infill projects(including neighborhood focal points) and existing development andthrough new subdivision standards.Develop street standards that emphasize the safe and sufficientmovement vehicles, pedestrian safety, streetscapes, and compatibilitywith adjoining urban features and incorporate naturalistic ‘green street’4.13-13<strong>City</strong> of <strong>Ventura</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!