11.07.2015 Views

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Saticoy</strong> & <strong>Wells</strong> <strong>Community</strong> <strong>Plan</strong> and Code EIRSection 4.14 Utilities and Service SystemsTable 4-13-5Wastewater Generation FactorsLand UseResidentialIndustrialCommercialPublic StructuresRecreationHospitalSchoolCollegeAverage Flow0.00013 cfs/capita0.0081 cfs/acre0.0061 cfs/acre0.0061 cfs/acre0.00031 cfs/acre0.039 cfs/100 beds0.031 cfs/1,000 students0.031 cfs/1,000 studentsSource: <strong>Ventura</strong> Standards and Design Manual, 2000b. Project Impacts and Mitigation MeasuresImpact U-1<strong>Development</strong> facilitated by the Project would increase waterdemand by a net increase of approximately 1,014 acre feet peryear (AFY). The total estimated water available from LakeCasitas, the <strong>Ventura</strong> River diversion, and groundwater basins is28,000 AFY, which is sufficient to meet these projected demandincreases. Therefore, water supply impacts would be Class III,less than significant.<strong>Development</strong> facilitated by the Project would generate a water demand increase estimated at1,014 AFY, as indicated in Table 4.14-6. Overall projected water demand for 2018 is 22,969 AFYand projected water supply is 29,900 AFY (<strong>City</strong> of San Buenaventura 2008 Biennial WaterSupply Report). The 2018 demand is projected to be 23,983 AFY, which is within the projectedsupply.Agricultural areas within the Project Area are not served by the <strong>City</strong> water system, but doutilize water from private wells drawing from the same groundwater basin as the <strong>City</strong>. Whenthese lands are taken out of agricultural production, the available water supply that can beextracted from existing <strong>City</strong> wells or new <strong>City</strong> wells increases. Although water use variesdepending on such conditions as crop type and soil characteristics, the average agriculturalirrigation use is assumed to be 2.5 feet per year (30 inches) (2005 General <strong>Plan</strong>). Within theProject Area, 160 acres of lands in agricultural production are slated for conversion to urbanuses. Using the equation 2.5 AFY x 160-acres, the conversion of 160 acres would yield a 400-AFY water credit. This would create an additional source of water available for urban demandin the <strong>City</strong>.4.14-11<strong>City</strong> of <strong>Ventura</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!