11.07.2015 Views

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Saticoy</strong> & <strong>Wells</strong> <strong>Community</strong> <strong>Plan</strong> and Code EIRSection 6.0 AlternativesAs with the proposed project, demand that would occur under Alternative 3 for fire and policeservices would be mitigated through the 2005 General <strong>Plan</strong> Actions 7.13 and 7.15, which aids insecuring funds for needed improvements.Based on the student generation factors used in Section 4.13, Public Services, the developmentreduction associated with not converting agricultural lands would reduce the total studentsattending Project Area Schools. The reduction would include 164 elementary, 67 middle school,and 82 high school students for a total of 313 students. This is a 41% reduction as compared tothe student generation of the Project. Payment of school fees would mitigate the studentsassociated with accommodated development under Alternative 3.Park facility impacts would be lower under Alternative 3 as well. As with the proposed project,park fees are required for the Project Area development.UtilitiesThe overall demand for utility services would be lower than that of the Project. Tables 6-7through 6-9 compare utility demands or generation for Alternative 3 and the Project.Table 6-7Water Demand Comparison(Alternative 3 vs. Project)Land Use Units (du or sf) RateWaterDemandAlternative 3Residential1,089 du0.5 Acre-feet perdwelling unit544.5Non-Residential135,625 sf9 acre-feet per25,000 square feet48.8Alternative 3 Total 593.3Project Total a 1,013.9AFYDifference -420.6du = dwelling units, sf = square feetSource for Demand Factors: Urban Water Management <strong>Plan</strong>, 2005a From Table 4.14-6Alternative 3 water demand would be reduced by an estimated 420.6 AFY, wastewatergeneration would be reduced by 276,683 gpd, and solid waste generated would be reduced byabout 7 tons per day. This represents reductions of 41%, 44% and 39% for water demand,wastewater generation and solid waste, respectively, as compared to the Project. As with theProject, significant project impacts would not occur, though this alternative would contribute tothe significant solid waste impact identified in the 2005 General <strong>Plan</strong> FEIR.6-8<strong>City</strong> of <strong>Ventura</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!