11.07.2015 Views

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Saticoy</strong> & <strong>Wells</strong> <strong>Community</strong> <strong>Plan</strong> and Code EIRSection 4.15 Traffic and CirculationTable 4.15-4<strong>City</strong> of <strong>Ventura</strong> Committed Roadway Network Improvements within the Project AreaRoadways/IntersectionsTelegraph Road (<strong>Saticoy</strong> Avenue to <strong>Wells</strong> Road)<strong>Wells</strong> Road (SR-126 to <strong>City</strong> limits)<strong>Wells</strong> Road (Telegraph Road to Carlos Drive)<strong>Wells</strong> Road (Carlos Street to Citrus Drive)“A” Street (<strong>Saticoy</strong> Avenue to <strong>Wells</strong> Road)<strong>Wells</strong> Road/SR-126 Eastbound Ramps intersection<strong>Wells</strong> Road/Darling Road intersection<strong>Wells</strong> Road/Telephone Road intersection<strong>Wells</strong> Road/Nardo StreetNorth Bank Drive (<strong>City</strong> limits to <strong>Wells</strong> Road)North Bank Drive (Current terminus to <strong>Saticoy</strong> Avenue)ImprovementMaintained and enhanced as two-lane road aWiden to six LanesWiden to four lanesWiden to four lanesNew two-lane roadwayAdd third northbound and southbound through lanesAdd third northbound and southbound through lanesAdd third northbound and southbound through lanesAdd third northbound and southbound through lanesNew two-lane roadwayNew two-lane roadwaySource: <strong>City</strong> of <strong>Ventura</strong>, General <strong>Plan</strong> EIR, 2005; ATE, Parklands Project, <strong>City</strong> of <strong>Ventura</strong>, Traffic and Circulation Study.September 2008.aAs part of the UC Hansen Project, the <strong>City</strong> is reserving the right to reclassify this roadway if traffic increases necessitateincreased capacity. See text below for further information.Mobile Home Park and west of the Project Area. When fully constructed, this roadway willprovide a direct connection between the Parklands Specific <strong>Plan</strong> area and <strong>Saticoy</strong> Avenue.Interim improvements are proposed for the segment of Telegraph Road from <strong>Saticoy</strong> Avenue to<strong>Wells</strong> Road and the segment of <strong>Wells</strong> Road between Telegraph and Carlos Street. The UCHansen Trust Project resulted in the <strong>City</strong> deciding to maintain and enhance Telephone <strong>Wells</strong>Roads as two-lane roads (Secondary Arterials) until traffic volumes necessitate the conversionto a four-lane road. The Secondary Arterial classification in the General <strong>Plan</strong> preserves thepotential for the streets to be expanded if needed. In the event that future traffic volumesnecessitate the conversion of these streets to four lanes, the street cross sections shall bedetermined by the <strong>City</strong> of <strong>Ventura</strong> <strong>Community</strong> <strong>Development</strong> Department.Committed roadway and intersection improvements listed in Table 4.15-4, were assumed in theYear 2025 analysis provided in this traffic study. Frontage improvements planned to occur inconjunction with the Project are described below.4.15-10<strong>City</strong> of <strong>Ventura</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!