11.07.2015 Views

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Saticoy</strong> & <strong>Wells</strong> <strong>Community</strong> <strong>Plan</strong> and Code EIRSection 4.15 Traffic and Circulation• Telegraph Road. Frontage improvements include widening of Telegraph Road alongthe project’s frontage to provide two-travel lanes, parallel parking on both sides of thestreet, a bike lane on the south side of the street, a central median, and a 28-footparkway on the north side of the street. The proposed parkway would provide ameandering bike lane and pedestrian path.• <strong>Wells</strong> Road (north of Citrus Drive). Improvements include widening the street toprovide one travel lane in each direction with parallel parking and bicycle lanes onboth sides of the street. A center median would also be installed along this segment.• <strong>Wells</strong> Road (South of Citrus Drive). Improvements including widening the roadwayto provide two travel lanes in each direction, as well as bicycle lanes on both sides ofthe street. A center median would also be installed along this segment.• Blackburn Road. Blackburn Road would be realigned to connect to the [ProjectArea’s] main roadway approximately 100 feet west of <strong>Wells</strong> Road. Additionalimprovements would include construction of curb, gutter and sidewalk on BlackburnRoad along the [Project Area] frontage.4.15.2 Impact Analysisa. Methodology and Significance Thresholds. In August, 2005, the <strong>City</strong> certified afinal environmental impact report (FEIR) and adopted a comprehensive revision of the General<strong>Plan</strong>, including the Circulation Element. As part of that effort, 2025 traffic levels were modeledbased on projected growth and a program of recommended improvements was devised toachieve and maintain the desired level of service on area roadways and intersections. Thetraffic analysis prepared for the 2005 General <strong>Plan</strong> (incorporated herein by reference andavailable for review at the <strong>City</strong> <strong>Plan</strong>ning Department) was based on growth assumptions for allof the various planning sub-areas of the <strong>City</strong>, including the Project Area. A comparison of thegrowth forecast for the Project with the assumptions used for the 2005 General <strong>Plan</strong> FEIR trafficmodel reveals that the Project would accommodate a comparable level of development atbuildout as that assumed for the 2005 General <strong>Plan</strong>, resulting in comparable roadway andintersection impacts.Accordingly, the analysis provided in this EIR characterizes traffic levels associated withgrowth facilitated by the Project within the context of the growth forecasts contained in the 2005General <strong>Plan</strong> and focuses on impacts to the local circulation system that may result from theroadway and intersection improvements recommended by the Project.Performance standards include level of service E (peak hour ICU less than or equal to 1.00) forfreeway ramp intersections and non-Principal Intersections that are located in the CMPnetwork. Level of service D (peak hour ICU less than or equal to 0.90) is the performancestandard for all other principal intersections. For an intersection that is forecast to operateworse than its performance standard, the impact of a project is considered to be significant if theproject increases the ICU by more than 0.01. Additionally, impacts relating to transportationand circulation would be considered potentially significant if development facilitated by theProject would:4.15-11<strong>City</strong> of <strong>Ventura</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!