11.07.2015 Views

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

Saticoy & Wells Community Plan & Development ... - City Of Ventura

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Saticoy</strong> & <strong>Wells</strong> <strong>Community</strong> <strong>Plan</strong> and Code EIRSection 6.0 Alternativescirculation systems, and new parks. In addition, this alternative would not address any of theinfrastructure deficiencies within the Project Area or address possible impacts relating to trafficgrowth. Failure to provide additional housing and non-residential development within theProject Area could potentially result in overcrowded conditions within the existing housingstock, lack of jobs for local residents, and increased traffic. Finally, it should be noted that thisalternative may not feasible because it would involve prohibiting all development, includingthat associated with already entitle projects.6.2 ALTERNATIVE 2: ELIMINATE LARGE RETAIL FROMBROOME SITE (ONLY RESIDENTIAL)6.2.1 DescriptionThis alternative would assume residential development for the Broome site under the<strong>Community</strong> <strong>Plan</strong>. The conceptual <strong>Community</strong> <strong>Plan</strong> development assumptions include 125,000sf of commercial development and up to 236 dwelling units with 3.6 acres of parks for theBroome Site. This alternative would assume 25,000 sf of commercial and up to 268 dwellingunits with 5.5 acres of parks on the Broome site.. This represents an 80% reduction incommercial space and a 14% increase in dwelling units from development projection assumedfor the site through 2025. Table 6-1 compares potential development under Alternative 2 todevelopment forecasts for the Project.Table 6-1Project vs. Alternative 2 Potential <strong>Development</strong>Developable Area (acres)Residential UnitsCommercial Floor Area(square feet)<strong>Community</strong> <strong>Plan</strong> total 794 1,833 270,625Alternative 2 total 794 1,865 170,625Net Change 0 + 32 - 100,000Implementation of Alternative 2 would result in additional changes to the Project. Thesechanges would include alteration to proposed Action 11.2.6 to remove the specification of50,000 sf of commercial for the Broome Site and a change to the amount of commercial landidentified for the General <strong>Plan</strong> Amendment addressing Table 3-2 of the 2005 General <strong>Plan</strong>. Theproposed T.5.3 zoning would continue to apply to the Broome Site.6.2.2 Impact AnalysisAir QualityAir pollutant impacts associated with this alternative would be generally similar to, but slightlylower than what would occur under the Project’s potential development scenario. As indicatedin Table 6-5, overall vehicle trips would be reduced by about 4,000 ADT, or 17%, due to thereduction in commercial development. As with the Project, impacts would be less than6-2<strong>City</strong> of <strong>Ventura</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!