11.07.2015 Views

Kenya Multi-Year Programme 2011-2013 - VVOB

Kenya Multi-Year Programme 2011-2013 - VVOB

Kenya Multi-Year Programme 2011-2013 - VVOB

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Kenya</strong> - <strong>Multi</strong>-<strong>Year</strong> <strong>Programme</strong> <strong>2011</strong>-<strong>2013</strong> 82/148<strong>Programme</strong> description Indicators MoV AssumptionsSR 1.2: Strengthen the ICT IntegrationTeam & ―ICTfor Education‖ Unit (ICT4E)(educational/pedagogy) to plan, developand implement appropriate ICT integratedstructures within the whole educationalsector, from HQ to school level .(Through: training courses, on-the-jobtraining, meetings, workshops,management advice)SR 1.3: Support critical technicalinstallations/infrastructure at MOE HQ,SAGA‘s and selected provinces/districtsto enable an accelerated ICT Integrationin Education process within theeducational system (through:improvement of connectivity, databases,applications, support & maintenance)• Institutional framework for ICTIntegration Team & ―ICTforEducation‖ division is fine-tuned (todeliver development; planning andimplementation of appropriate ICTintegrated structures within the wholeeducational sector.• Number of educational/pedagogycourses/trainings followed andconferences/ seminars/ workshopsattended by each member of the ICTIntegration Team and ICT4E Unit• Number of well documentedmeetings for ICT Integration Teamand ICT4E Unit.• Number of critical technicalinfrastructure and connectivityinstallations in direct support for theimplementation of the programmeresults at HQ, SAGA‘s andprovinces/districts (acceleration of theICT Integration in Education processwithin the educational system).• Number of designs, developments,installations and configurations relatedto network (LAN, WAN, Internet…)and server capacities expansion, touser applications, to systemredundancies, to data and securitymanagement and to other technicalimplementations• Institutional framework document forICT Integration Team and ICT4E Unit.• ICT Integration Team, ICT4EICT andKESSP meeting minutes andprogress/evaluation reports.• Reports of training, study visits etc.• ICT Unit design, development,installation and configurationdocuments in relation to infrastructure,connectivity, networks, servers,applications, databases, security• Work plans and meeting minutes of ICTUnit, ICT Integration Team, ICT4E Unit,KESSPThe ―ICT for Education Division‖ is set upas proposed by institutional framework(2010).ICT IP is adequately funded throughKESSP II

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!