13.07.2015 Views

6\VWHP $GPLQLVWUDWLRQ 0DGH (DV\

6\VWHP $GPLQLVWUDWLRQ 0DGH (DV\

6\VWHP $GPLQLVWUDWLRQ 0DGH (DV\

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IntroductionWho Should Read This Book?For an ongoing productive environment, we assume that the: R/3 System is completely and properly installed Infrastructure is set up and functionalThe following checklist will help you determine if your system is set up to the baselineassumptions of this book. If you can log on to your R/3 System, most of these tasks havealready been completed.Is the backup equipment installed and tested? Is the Uninterruptible Power Supply (UPS) installed? Is a server or system monitor available? Are the following utility software installed (as appropriate)? Backup program Hardware monitors System monitors UPS control R/3 System Is R/3 installed according to SAP’s recommendation? Is the TPPARAM file configured?(In Release 4.6, TMS creates a file to be used as the TPPARAM file.) Is the TMS/CTS configured? Is the SAProuter configured? Is the OSS1 transaction configured? Is the ABAP workbench configured? Has initial security been configured (default passwords changed)? Are the NT sapmnt share or UNIX NFS sapmnt exports properly configured? Is the online documentation installed? Can users log on to R/3 from their desktops?For optimal results, we recommend that the minimum screen resolution be set as follows: For the users, 800 × 600 For the system administrator, 1024 × 768 and a minimum color depth of 256 colorsThe Release 4.6 GUI displays better with 64K colors.xxiv xxivRelease 4.6 A/B

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!