women held seats <strong>in</strong> the Prov<strong>in</strong>cial Council and, compared with previousyears, more women stood for election to the Wolesi Jirga.In addition, the <strong>Netherlands</strong> contributed to the reestablishment of women’sshuras. October 2009 saw the first women’s shura <strong>in</strong> Tar<strong>in</strong> Kowt <strong>in</strong> years.The <strong>Netherlands</strong> contributed to the celebration of International Women’sDay, dur<strong>in</strong>g which the women and their issues had the attention of theprov<strong>in</strong>cial authorities for the day. The board of the Afghan Women’sBus<strong>in</strong>ess Council visited Uruzgan, met with 500 women and set upactivities. The result of this shura was an <strong>in</strong>ventory of the problems whichwomen from Uruzgan encounter <strong>in</strong> their daily lives. As a direct consequenceof this shura, an Afghan aid organisation set up a handicraft project withDutch fund<strong>in</strong>g.The Nawa radio station <strong>in</strong> Uruzgan also paid a great deal of attention towomen’s rights and women’s issues. This was done on the basis of research<strong>in</strong> the prov<strong>in</strong>ce <strong>in</strong>to the wishes and needs of, <strong>in</strong>ter alia, women. In addition,attention was paid to gender awareness dur<strong>in</strong>g ANP tra<strong>in</strong><strong>in</strong>g. Such projectsrequired a cont<strong>in</strong>uous process of consultation with community leaders andthe governor to ensure their support and <strong>in</strong>volvement so that these<strong>in</strong>itiatives would cont<strong>in</strong>ue to progress.Sub-conclusion on sectoral efforts / general sub-conclusion on socioeconomicdevelopmentGiven the start<strong>in</strong>g position, a considerable amount has been achieved <strong>in</strong>Uruzgan over the four years. The capacity of the local authorities, nationalprogramme and NGOs was limited, and due to the negative perception ofthe prov<strong>in</strong>ce at the national level, it was not easy to f<strong>in</strong>d qualifiedpersonnel. Significant progress was made <strong>in</strong> the socio-economic area.That progress was ma<strong>in</strong>ly ow<strong>in</strong>g to the good cooperation with Afghanpartners. Thanks to their knowledge of the local dynamics and their accessto the local population, even <strong>in</strong> the remotest areas, trust was ga<strong>in</strong>ed and asupport base created for the Dutch mission. The implementation ofnumerous projects, at all times ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g a careful balance between thevarious population groups, contributed to an economic revival <strong>in</strong> Uruzgan.Coord<strong>in</strong>ation, synchronisation with the authorities and monitor<strong>in</strong>g of thevarious activities cont<strong>in</strong>ued to require attention due to the fragile localenvironment.The mission has laid a foundation for development, opened up the prov<strong>in</strong>ceto the outside world and managed to <strong>in</strong>terest an extensive network ofactors, <strong>in</strong>clud<strong>in</strong>g UN organisations, <strong>in</strong> this prov<strong>in</strong>ce. Br<strong>in</strong>g<strong>in</strong>g <strong>in</strong> nationalprogrammes and actors with experience <strong>in</strong> the areas of education, healthcare and rural development gave an <strong>in</strong>itial impulse for susta<strong>in</strong>able, longtermdevelopment. Significant progress was made <strong>in</strong> the areas ofeducation, health care, water and energy supply, food security, alternativecrops and local media. The accessibility of the prov<strong>in</strong>ce also improvedconsiderably. The pav<strong>in</strong>g of the prov<strong>in</strong>cial road to Chora has led to moreactivity, better market access and better access to health care. Theeconomic base and activity have <strong>in</strong>creased, particularly <strong>in</strong> areas whichga<strong>in</strong>ed access to local and regional markets. Food security has alsoimproved considerably. The socio-economic development was the mostsubstantial around the three largest towns, but even outside that area,activity <strong>in</strong>creased. The population’s freedom of movement <strong>in</strong>creased greatlyand the prov<strong>in</strong>ce has become more accessible to NGOs and IOs.Page 78 of 133
5 Expenditure for the mission and implementationaspectsThe Dutch <strong>participation</strong> <strong>in</strong> Afghanistan has demanded a considerableamount from personnel and materiel, and taken a great f<strong>in</strong>ancial toll.Expenditure for the mission was funded ma<strong>in</strong>ly by the m<strong>in</strong>istries of Defenceand Foreign Affairs, from the Homogenous Budget for InternationalCooperation (HGIS). There was also fund<strong>in</strong>g from the Defence budget itself.In addition to the expenditure for the mission, funds from the regularsusta<strong>in</strong>ment and read<strong>in</strong>ess operations of the armed forces can also berelated to the <strong>ISAF</strong> deployment. This chapter discusses the expenditureand a number of implementation aspects.5.1 Expenditure for the missionThe total expenditure funded by the m<strong>in</strong>istries of Defence and ForeignAffairs for the Dutch <strong>participation</strong> <strong>in</strong> <strong>ISAF</strong> from <strong>2006</strong> to <strong>2010</strong> amounted toEUR 1.991 billion. Most of this was funded from the Homogenous Budget forInternational Cooperation (HGIS). Additional funds were also added to theregular Defence budget for the purpose of the mission, <strong>in</strong> order to fundmission-specific expenditure not covered by the HGIS budget, such asmateriel <strong>in</strong>vestments.Overview of the total expenditure for the Dutch <strong>participation</strong> <strong>in</strong> Uruzgan, <strong>2006</strong>-2011.Expenditure for Dutch<strong>participation</strong> <strong>in</strong>UruzganHGIS<strong>2006</strong> 2007 2008 2009 <strong>2010</strong> 2011 TotalHGIS Defence 143,943 232,566 279,270 299,151 272,598 1,227,528HGIS Foreign Affairs 53,727 62,428 78,544 110,264 68,720 373,863HGIS total 1,603,291Budget addition toregular Defencebudget 55,000 50,000 105,000 80,000 50,000 50,000 390,000TOTAL 1,991,391Amounts x € 1,000Prior to the period dealt with <strong>in</strong> this <strong>evaluation</strong>, the <strong>Netherlands</strong> was also<strong>in</strong>volved <strong>in</strong> Afghanistan. This concerned relatively small contributions to<strong>ISAF</strong> and OEF, <strong>in</strong>clud<strong>in</strong>g the deployment of F-16s, a contribution to the<strong>in</strong>ternational staffs, the deployment of a PRT and the deployment of specialforces. The <strong>in</strong>volvement <strong>in</strong> Afghanistan as part of OEF and <strong>ISAF</strong> <strong>in</strong> theperiod from 2002 to <strong>2006</strong> cost around EUR 210 million, which was fundedfrom the HGIS budget. Costs aris<strong>in</strong>g from the Dutch <strong>participation</strong> <strong>in</strong>Afghanistan have also been estimated for the period after the <strong>evaluation</strong>period. This concerns a national contribution to <strong>ISAF</strong> and the cost ofredeployment. For 2011 this amounts to EUR 105 million, while for 2012the amount is EUR 20 million.Page 79 of 133
- Page 1 and 2:
Final evaluationNetherlands contrib
- Page 3 and 4:
High mountainsLow mountainsPlains a
- Page 5 and 6:
Table of ContentsDutch military per
- Page 7 and 8:
Dutch military personnel deceased i
- Page 9 and 10:
Page 9 of 133
- Page 11 and 12:
1 IntroductionThe government would,
- Page 13 and 14:
The structure of the final evaluati
- Page 15 and 16:
2 The international presence in Afg
- Page 17 and 18:
insurgents in, particularly, the ea
- Page 19 and 20:
3 Netherlands policy for participat
- Page 21 and 22:
Netherlands’ presence. Furthermor
- Page 23 and 24:
“The objectives of this stabilisa
- Page 25 and 26:
In December 2005, the Netherlands g
- Page 27 and 28: The expectation is that meaningful
- Page 29 and 30: 3.6.2 Implementation of national pr
- Page 31 and 32: 4 Implementation of the mission and
- Page 33 and 34: tasks to fulfil in the area of secu
- Page 35 and 36: such as the Bushmaster, that was be
- Page 37 and 38: Afghan partner unit, at all times o
- Page 39 and 40: northern part of Deh Rawod in 2007.
- Page 41 and 42: in large and small bases, while con
- Page 43 and 44: previously thought and comprised a
- Page 45 and 46: Apart from facilitating training an
- Page 47 and 48: If operations in close proximity of
- Page 49 and 50: As previously mentioned, the preven
- Page 51 and 52: - Between 2006 and 2010, the number
- Page 53 and 54: government of Chora in January 2010
- Page 55 and 56: At the beginning of the Dutch missi
- Page 57 and 58: intermediary of TLO and political a
- Page 59 and 60: interest for filling judicial posit
- Page 61 and 62: During the Uruzgan mission, a great
- Page 63 and 64: structurally change governance in U
- Page 65 and 66: development programmes. Before the
- Page 67 and 68: also the way in which Afghans perce
- Page 69 and 70: tailored to the real needs of the p
- Page 71 and 72: Gizab had increased and there was a
- Page 73 and 74: The DCU programme devoted and still
- Page 75 and 76: purpose of these loans, cooperative
- Page 77: In view of the lack of enthusiasm a
- Page 81 and 82: Overview of long-term expenditure a
- Page 83 and 84: expenditure related to the deployme
- Page 85 and 86: Multi-year expenditure, Foreign Aff
- Page 87 and 88: explosive ordnance disposal, armour
- Page 89 and 90: this situation as constraining, for
- Page 91 and 92: organised at a later stage. In addi
- Page 93 and 94: occupational social workers and the
- Page 95 and 96: Mercedes Benz terrain vehicle, the
- Page 97 and 98: 6 ConclusionsThis chapter begins wi
- Page 99 and 100: The first part of the central quest
- Page 101 and 102: At the end of 2005, the Afghan auth
- Page 103 and 104: province. This, too, was done by me
- Page 105 and 106: area, increased sales of agricultur
- Page 107 and 108: ISAF and the OEF led to extra coord
- Page 109 and 110: d. The recommendations from advisor
- Page 111 and 112: Page 111 of 133
- Page 113 and 114: Annex A, Afghanistan Compact Benchm
- Page 115 and 116: end-2010, reforms will strengthen t
- Page 117 and 118: Afghan Cultural HeritageA comprehen
- Page 119 and 120: Private Sector Development and Trad
- Page 121 and 122: Annex B, Results of the socio-econo
- Page 123 and 124: EducationTLO data:• In 2006 there
- Page 125 and 126: Overview of the number of children
- Page 127 and 128: Annex C, Chronology200522 December:
- Page 129 and 130:
July: microcredit provider World Co
- Page 131 and 132:
Annex D, List of abbreviations3DADZ
- Page 133:
Page 133 of 133