R 1200 CL
R 1200 CL
R 1200 CL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
R <strong>1200</strong> <strong>CL</strong><br />
PDI Procedures - Integral ABS Bleed Test<br />
BMW is the inventor of ABS for motorcycles and therefore places the greatest<br />
emphasis on safety and customer satisfaction. For that reason, this comprehensive<br />
ABS bleed test using the MoDiTeC is required as part of the PDI<br />
process prior to any operation of the vehicle.<br />
During the test, the MoDiTeC prompts you to individually apply the brakes at the<br />
front lever and rear pedal. The Integral ABS control module monitors the pressures<br />
generated in the control and wheel circuits. The MoDiTeC program compares<br />
the generated pressures to a specific value. If the generated pressures<br />
are within specification, the system passes. If not, the system fails.<br />
During the test a large amount of data is read out from the control module. As<br />
a record of the test being carried out, the documentation generated by the completion<br />
of this test must be printed out and kept in the vehicle history file.<br />
Bleed Test Requirements<br />
Prior to performing Bleed Test, make sure the following preconditions are met:<br />
• Up to date MoDiTeC software must always be loaded.<br />
• Motorcycle battery must be fully charged.<br />
• Battery charger must be connected to motorcycle.<br />
• From the Integral ABS Toolbox, launch the bleed test program. Follow all<br />
onscreen instructions.<br />
• Printout and sign your name and date to the successful bleed test results and<br />
insert into vehicle history file.<br />
If you encounter problems that can not be rectified either with bleed test or bleed<br />
procedure please contact the Integral ABS Hotline.<br />
Integral ABS Hotline: 1 888-217-9725 (Monday-Friday, 8:30am - 4:30pm EST).<br />
56<br />
Important !<br />
If the motorcycle fails this bleed test during the PDI, the reported failed circuit<br />
will require bleeding. Refer to the appropriate repair manual and training manuals<br />
for for system bleeding instructions.<br />
This motorcycle shall not be test ridden, retailed, traded, or in any way<br />
demonstrated, or handed over to, the retail customer until a successful bleed<br />
test printout for the motorcycle is placed into the vehicle history file.<br />
R <strong>1200</strong> <strong>CL</strong> Introduction