05.12.2012 Views

R 1200 CL

R 1200 CL

R 1200 CL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

R <strong>1200</strong> <strong>CL</strong><br />

PDI Procedures - Check Side Stand Function<br />

Check Side Stand Operation<br />

• Check for smooth side stand movement.<br />

Add BMW Lube if necessary<br />

(arrow).<br />

• Check side stand safety function.<br />

With transmission in gear and ignition<br />

key on, raise side stand to up<br />

position and listen for audible fuel<br />

pump operation cycle. This signifies<br />

proper safety operation.<br />

Rear Spring Preload<br />

• Turn knob fully out counter clockwise<br />

(to low position).<br />

Basic Setting (solo): Turn knob in to<br />

first increment line (red dot).<br />

Setting for two up/luggage: Turn knob<br />

in to High setting increment line.<br />

Check rear wheel stud torque<br />

• 105 Nm (76 Ft lb.)<br />

• Record your verified torque value<br />

on the PDI Check List.<br />

58<br />

Check Side Stand Operation<br />

Red Dot = Solo Position<br />

Shock Absorber<br />

Spring Preload Knob<br />

Rear Shock Spring Preload Adjustment<br />

R <strong>1200</strong> <strong>CL</strong> Introduction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!