- Page 1 and 2:
CARE (SORGE ) FOR ARCHITECTURE mari
- Page 3:
15. Mostra Internazionale di Archit
- Page 7 and 8:
01. Statement p. 6 marián zervan 0
- Page 9 and 10:
Architecture must never lose its pr
- Page 11 and 12:
The SNG building/area has long been
- Page 14 and 15:
02. ON THE SLOVAK NATIONAL GALLERY
- Page 16 and 17:
investor : Povereníctvo pre škols
- Page 18 and 19:
Building(s) and spatial relationshi
- Page 20 and 21:
the arcaded palace with a “cour d
- Page 22 and 23:
give the quarter a new scale and ex
- Page 24 and 25:
founded earlier. Therefore construc
- Page 26 and 27:
in 1968) in 1966-1967 with the gall
- Page 28 and 29:
with its central square, to a field
- Page 30 and 31:
thing that had been outlived in the
- Page 32 and 33:
The commission discussed these expe
- Page 34 and 35:
In late 1969, i.e. after Czechoslov
- Page 36 and 37:
The ceiling is of waved metal plate
- Page 38 and 39:
The architect’s second alternativ
- Page 40 and 41:
unbuilt stages III and IV. The (fut
- Page 42 and 43:
“Doch gerade durch diese brachial
- Page 44 and 45:
associated project of reconstructio
- Page 46 and 47:
[1] [2]
- Page 48 and 49:
[4] [5] [4-5] Vladimír Dedeček, S
- Page 50 and 51:
[9] [10] [9-16] Vladimír Dedeček,
- Page 52 and 53:
[18] [19] [18-23] Vladimír Dedeče
- Page 54 and 55:
[26] [27] [26-29] Built edifices of
- Page 56 and 57:
03a. TEXTUAL INTERPRETATION OF COMP
- Page 58 and 59:
The Slovak National Gallery area si
- Page 60 and 61:
was that either to allow for or to
- Page 62 and 63:
The administrative building’s ter
- Page 64 and 65:
Indeed the amphitheatre clusters ev
- Page 66 and 67:
locked it in places (the Water Barr
- Page 68 and 69:
03b. ARCHITECTURAL INTERPRETATION O
- Page 70 and 71:
[d—02] Built SNG edifices {red} i
- Page 72 and 73:
[d—04] Paths of movement {red lin
- Page 74 and 75:
[d—06] Clusters of SNG “agoras
- Page 76 and 77:
[d—08] SNG interior “amphitheat
- Page 78 and 79:
C A B [d—10] Two introductory pro
- Page 80 and 81:
[d—12] Superimposition of 1 st an
- Page 82 and 83:
[d—14] Relationships of module fi
- Page 84 and 85:
[d—16] 1 st subterranean level wi
- Page 86 and 87: [d—18] 2 nd level of administrati
- Page 88 and 89: [d—20] 4 th level with paths of m
- Page 90 and 91: [d—22] 6 th level with paths of m
- Page 92 and 93: [d—24] Facade rasters {according
- Page 94 and 95: [d—26] Built edifices of SNG area
- Page 96 and 97: 04. CHRONOLOGY monika mitášová,
- Page 98 and 99: 1961 the director of the SNG Dr. Ka
- Page 100 and 101: 1969 a new initial project for the
- Page 102 and 103: pressing. The architectural works t
- Page 104 and 105: for Cultural and Educational Buildi
- Page 106 and 107: 1987 journal Výtvarný život publ
- Page 108 and 109: south Danube wing (closed due to it
- Page 110 and 111: and demolished this square. (...) I
- Page 112 and 113: not as an MP but as “the former d
- Page 114 and 115: [is] a need to build any more so ca
- Page 116 and 117: in Bratislava was announced. The ju
- Page 118 and 119: down and changed the character of c
- Page 120 and 121: totalitarian style haunting Europea
- Page 122 and 123: Illah van Oijen prepared the first
- Page 124 and 125: Arts Council to appreciate the valu
- Page 126 and 127: Selected works of Vladimír Dedeče
- Page 128 and 129: on 14 th March, the Týždeň magaz
- Page 130 and 131: 05. PROJECT DESCRIPTION marián zer
- Page 132 and 133: This project The Care for Architect
- Page 134 and 135: The entrance wall in-between contai
- Page 138 and 139: 06. PHOTOS OF THE SNG MODEL
- Page 141: 138 | 139
- Page 145 and 146: 142 | 143