Public Policy: Using Market-Based Approaches - Department for ...
Public Policy: Using Market-Based Approaches - Department for ...
Public Policy: Using Market-Based Approaches - Department for ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Public</strong> <strong>Policy</strong>: <strong>Using</strong> <strong>Market</strong>-<strong>Based</strong> <strong>Approaches</strong><br />
Local innovation was ensured by setting out national objectives in bidding<br />
documents and then allowing each local authority to propose the details of a<br />
choice-based scheme that would achieve these objectives in their locality. An<br />
example of different approaches taken by three local authorities is given in Table<br />
10.4 below. One of them, Harborough, is an area comprising 92 villages whose<br />
residents rarely move further than 2 miles from their existing location. Housing<br />
officials in Harborough have found it unnecessary to spend resources on photos<br />
of properties in adverts, as applicants are generally aware of the properties in<br />
the area in which they would consider moving. The main vulnerable group in<br />
Harborough has been those with literacy or health problems. This is in contrast<br />
to Camden, where the ethnic minority population is significant and potentially<br />
very vulnerable. Whereas Harborough provides in<strong>for</strong>mation in English and<br />
Braille only, Camden translates its in<strong>for</strong>mation into five different languages.<br />
Scheme design was there<strong>for</strong>e the product of ODPM’s bidding criteria and local<br />
authorities’ views on how best to implement an allocation system using choice<br />
<strong>for</strong> their area. Economists were not involved in either the development of<br />
bidding criteria or the bids. However, economists are involved in the ODPM’s<br />
ongoing longer-term evaluation of pilot schemes.<br />
Table 10.4<br />
Sample of scheme designs by locality<br />
Source: Interviews as be<strong>for</strong>e.<br />
Blackburn Camden Harborough<br />
Assessment mechanism Two bands: general and Effective currency is Three bands: priority,<br />
priority. Within bands, points awarded <strong>for</strong> a preference and potential.<br />
currency is waiting time. weighted combination Within bands, currency<br />
of housing need and is waiting time.<br />
waiting time.<br />
Channels used to Local press; website; Weekly local press; website; Adverts mailed to priority<br />
advertise properties touch-screen kiosks in brochures; email lists; and preference members;<br />
local offices. SMS text messages <strong>for</strong> all properties advertised<br />
registered applicants. on website and in property<br />
shop<br />
In<strong>for</strong>mation provided Size and type of property; Photo, description, Location, size and type<br />
in advert facilities; characteristics indicative ‘price’ in of property; facilities;<br />
of preferred applicant terms of points. applicant requirements<br />
e.g. number of children;<br />
rent and council tax band.<br />
Mechanisms to Educated organisations Bidding in<strong>for</strong>mation Adverts on community<br />
support the vulnerable working with vulnerable monitored and non-bidders buses and parking tickets<br />
groups about CBL and contacted; housing officials to ensure in<strong>for</strong>mation<br />
enabled them to act as can act as advocates available to all; involved<br />
advocates on their where needed; in<strong>for</strong>mation health and social workers,<br />
customers’ behalf and support available in who can act as advocates<br />
5 different languages.<br />
126