H.1 Task Order Procedures.<br />
Requests for Task Order Proposals (RTOP) shall be competed in accordance with the FAR 16.505(b)(1) and as<br />
specified in the GLOBAL INTELLIGENCE (GI)<strong>Global</strong> <strong>Intelligence</strong> (GI) Ordering Guideline (Section J.XX).<br />
H.1.1 The KO will issue the RTOP to the appropriate group of contractors based upon the mission area and the<br />
task order requirement. It is the Government’s intent to issue a RTOP which reflects a performance-based<br />
contracting approach. The Government will provide a PWS and applicable evaluation criteria unique to each<br />
individual task order. The RTOP will address performance objectives, metrics, anticipated contract type, period of<br />
performance, contract line item number (CLIN) structure, task order proposal instructions, due date and other special<br />
requirements, as needed. The Government’s RTOP does NOT constitute an authorization to start work. The<br />
Government is not required to approve or issue an award for any resulting task order proposals. <strong>Contract</strong>ors are<br />
mandated to submit either a request for waiver or a proposal in response to every RTOP. Waivers may be granted on<br />
a case by case basis. However, contractors must submit a detailed written statement to the KO seeking a waiver no<br />
later than 24 hours after receipt of RTOP. <strong>Contract</strong>ors must provide compelling justification in their request for a<br />
waiver. Compelling justification would include, but not be limited to: lack of resources due to large number of<br />
resources being devoted to other GLOBAL INTELLIGENCE (GI) task orders; inability to perform additional task<br />
orders due to forces beyond contractor’s control; funding constraints, etc.<br />
H.1.2 Response to RTOP. The contractor shall address the following in each of their proposals: (i) Proposal<br />
summary including:<br />
• RTOP number<br />
• Date submitted<br />
• <strong>Contract</strong>or’s name<br />
• <strong>Contract</strong>or task leader contact information<br />
• All proposed subcontractor(s) (as applicable)<br />
• Proposed start and finish dates including critical project tasks, sub tasks and milestones<br />
• Proposed total price or cost if a cost type task order with separate options for each CLIN as presented<br />
in the RTOP<br />
• Reference to any unique terms or conditions, or any requests to deviate from standard contract terms<br />
and conditions<br />
• Deliverables and Schedules<br />
(ii) Complete description of the technical approach to satisfying all task requirements with a start and completion<br />
date for all tasks and scheduled deliverables for each task (to include the offeror’s QCP).<br />
(iii) Cost/Price Proposal Volume. (No Cost/Price Information shall be included in any task order Technical response.<br />
All Cost/Pricing information must be submitted under separate cover or in a separate volume)<br />
(iv) Cost or Pricing data (for COST orders) or other than Cost and Pricing data may be required when there is not<br />
adequate price competition as defined at FAR 15-403-1 or when a cost type task order is contemplated. The KO will<br />
notify the offeror with the RTOP or prior to award if a Certificate of Current Cost or Pricing is needed.<br />
(v) Task Order Acceptance Period. The contractor shall specify a period of not less than ninety (90) working days<br />
from date of closing. This date may be extended by mutual agreement.<br />
H.1.3 Commencement of Work - The contractor shall commence work only after the issuance of the KO signed<br />
task order, unless otherwise directed by the KO in writing.<br />
H.1.4 Post Award - Should the need arise for a task order modification, the KO will provide the contractor<br />
detailed information which describes the need for alteration and will provide the contractor instructions on how to<br />
respond.<br />
H.2 Procedures for Task Order Award Selection.<br />
H.2.1 RTOP and ordering procedures are identified in H.1 TASK ORDER PROCEDURES and FAR 52.216-18,<br />
ORDERING (OCT 1995). The KO will utilize the GLOBAL INTELLIGENCE (GI) Ordering Guide for guidance