23.12.2012 Views

i. institutional support and commitment to continuous improvement

i. institutional support and commitment to continuous improvement

i. institutional support and commitment to continuous improvement

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Nathan Sosin<br />

Courses Taught (Two Academic Years Prior <strong>to</strong> Visit):<br />

SP 11 ARCH INARC 5123 Matter <strong>and</strong> Structures 2<br />

Educational Credentials:<br />

M.S.E. Civil Engineering – Completed April 2007<br />

B.S.E. Civil Engineering – Completed April 2006<br />

Dean’s List, University Honors, James B. Angell Scholar<br />

Teaching Experience:<br />

The School of the Art Institute of Chicago<br />

Professional Experience:<br />

Thorn<strong>to</strong>n Tomasetti, Inc. (Chicago, Il):<br />

Senior Engineer For International Structural Engineering<br />

Consultant. May 2008 – Present<br />

Intern Engineer Between Undergraduate And Graduate<br />

Studies. April – August 2006<br />

Kpff Consulting Engineers (New York, Ny)<br />

Design Engineer In Newest Office Of West Coast Structural<br />

Design Firm. May 2007 – April 2008<br />

U-M Department Of Civil & Environmental Engineering (Ann<br />

Arbor, Mi)<br />

Research Assistant In The University Of Michigan Cementitious<br />

Composites And Structures Labs. January – April 2007<br />

Robert Darvas Associates (Ann Arbor, Mi)<br />

Intern Engineer For Structural Engineering Consultant. January<br />

– April 2006 & August – December 2006<br />

C.A. Hull, Inc. (Walled Lake, Mi)<br />

Intern Project Engineer For Specialty Bridge Contrac<strong>to</strong>r. April –<br />

December 2005<br />

Diclemente Siegel Design, Inc. (Southfield, Mi)<br />

Draftsman In Mechanical & Electrical Engineering Departments.<br />

January – August 2002 & April – August 2004<br />

Licenses / Registration:<br />

LEED AP<br />

Professional Memberships:<br />

American Concrete Institute<br />

Green Office Artistic Challenge<br />

Ace Men<strong>to</strong>r<br />

U-M Concrete Canoe Team<br />

U-M Steel Bridge Team<br />

225 | Spring 2011<br />

IV. Supplemental Information<br />

Supplemental Information<br />

SECTION IV

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!