Site-Specific Health and Safety Plan (HASP) - Laschools.org
Site-Specific Health and Safety Plan (HASP) - Laschools.org
Site-Specific Health and Safety Plan (HASP) - Laschools.org
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
- Ensuring adequate project preparation, quality review, <strong>and</strong> submittal of the<br />
data quality assessment (DQA) report.<br />
• Project Chemist - The Project Chemist reports to the PM <strong>and</strong> is responsible for<br />
implementation of the QAPP. Responsibilities of the Project Chemist include the<br />
following:<br />
- Ensuring that project-required QA/QC procedures are clearly specified for<br />
field <strong>and</strong> laboratory activities;<br />
- Working directly with the PM, field personnel, <strong>and</strong> the Laboratory's PM to<br />
ensure that chemical data collection <strong>and</strong> analysis procedures are adequate<br />
for the project-specified level of data quality;<br />
- Ensuring that timely audits of the subcontract laboratory are performed;<br />
- Ensuring adequate project preparation, quality review, <strong>and</strong> submittal of the<br />
DQA report.<br />
• Laboratory QA Officer - The Laboratory QA Officer is responsible for ensuring<br />
that sufficient QA procedures are applied to laboratory analyses. The Laboratory<br />
QA Officer is also responsible for ensuring that adequate laboratory controls are<br />
utilized for a high level of data quality, <strong>and</strong> that data program requirements <strong>and</strong><br />
data quality objectives (DQOs) are met. Responsibilities of the Laboratory QA<br />
Officer include the following:<br />
- Initiating nonconformance reports <strong>and</strong>/or corrective actions as necessary;<br />
- Verifying completion of corrective actions for major nonconformances<br />
cited in audits;<br />
- Reviewing all statistical data to verify that the analytical laboratories are<br />
meeting stated QC goals; <strong>and</strong><br />
- Coordinating with the Project Chemist <strong>and</strong> Laboratory PM.<br />
• Laboratory Project Manager - The Laboratory PM is responsible for<br />
implementation of the QAPP (for analytical control) <strong>and</strong> any laboratory<br />
subcontract. The Laboratory PM ensures that project-required QA/QC procedures<br />
for laboratory activities are adhered to for the project-specified level of data<br />
quality. The Laboratory PM acts as the primary point of contact between the<br />
subcontract laboratory <strong>and</strong> Parsons.<br />
1-5<br />
K:\Depts\Dept48\LAUSD\MSA WORK\QAPP\Draft Final QAPP to DTSC\QAPP for OU 1 RAP.DOC<br />
285