LAUSD Proposed South Region High School #9 & Middle School #4<br />
5.0 PRE-FIELD WORK PHASE<br />
5-1<br />
December 2006<br />
<strong>Site</strong> <strong>Specific</strong> <strong>Health</strong> & <strong>Safety</strong> <strong>Plan</strong> (<strong>HASP</strong>)<br />
5.1 RISK ANALYSIS AND SAFETY SPECIFICATION DEVELOPMENT<br />
Procurement procedures require that a site-specific risk analysis be conducted before issuance of<br />
investigation <strong>and</strong> remediation RFPs. Using the pre-bid risk analysis checklist, the Project<br />
Manager leads this analysis, which documents existing exposures that may impact the work,<br />
surrounding facilities, equipment, workers, or the public at large. The analysis includes locating,<br />
documenting, <strong>and</strong> photographing items such as:<br />
• Overhead <strong>and</strong> underground power lines<br />
• Sewer <strong>and</strong> water utilities<br />
• Existing building interferences<br />
• Crane access ways<br />
• Traffic<br />
• Security<br />
• Fences<br />
• Water hazards<br />
• Existing geographical <strong>and</strong> environmental conditions<br />
• Investigation of Derived Waste (IDW) Disposal<br />
• Confined spaces<br />
Upon completion of the site risk analysis, high-risk activities are listed in the RFPs (as<br />
applicable), <strong>and</strong> bidders must describe controls <strong>and</strong> mitigation strategies in their proposals. The<br />
RFP notes that the list is representative <strong>and</strong> that the selected contractor must identify <strong>and</strong> control<br />
all work-related hazards.<br />
Pre-field work activities include a detailed analysis of the scope of work <strong>and</strong> safety specifications<br />
in the prime contract, Parsons’ project schedule <strong>and</strong> <strong>HASP</strong>, draft RFPs, <strong>and</strong> proposed<br />
subcontractor agreements. The Project’s st<strong>and</strong>ard safety specifications are given below.<br />
• Pre-Field Work <strong>Safety</strong> Meeting – Exhibit 5-1<br />
• <strong>Site</strong> <strong>Specific</strong> Risk Review Checklist – Exhibit 5-2<br />
5.2 DESIGN AND REMEDIAL ACTION REVIEW<br />
Periodic remedial action reviews are held in accordance with the project management plan. The<br />
Project <strong>Safety</strong> Manager participates in the review to ensure that safety issues are adequately<br />
addressed. During the remedial action review, the discussion focuses on how work is sequenced,<br />