Table J-2<br />

South Region High School #9 <strong>and</strong> Middle School #4 Operable Unit (OU) 1<br />

Alternative 3 (Excavation, On-<strong>Site</strong> Stabilization, Off-<strong>Site</strong> Disposal)<br />

Summary of Cost Estimate<br />

CLEANUP - Operable Unit 1 (North of Tweedy Blvd) Quantity (1)<br />

Project <strong>Plan</strong>s <strong>and</strong> Design<br />

Units Cost per Unit Total Cost<br />

Additional Remedial Investigation 0 LS $ 50,000 $ -<br />

Remedial Investigation/<strong>Health</strong> Risk Assessment Reporting 0 LS $ 100,000 $ -<br />

Feasibility Study/Remedial Action <strong>Plan</strong> 0.5 LS $ 100,000 $ 50,000<br />

Treatability Study<br />

<strong>Plan</strong>s<br />

1 LS $ 20,000 $ 20,000<br />

<strong>Site</strong> Survey 50 hours $ 185 $ 9,250<br />

Excavation & Grading & On-site Treatment Facility <strong>Plan</strong>s/Specs 1 LS $ 40,000 $ 40,000<br />

Erosion Control <strong>Plan</strong> 1 LS $ 5,000 $ 5,000<br />

RDIP 1 LS $ 50,000 $ 50,000<br />

Environmental QA/QC <strong>Plan</strong> 1 LS $ 12,000 $ 12,000<br />

Public Participation (meetings, fact sheets, etc.) 250 hours $ 150 $ 37,500<br />

Permitting<br />

Subcontractor Submittals<br />

1 LS $ 30,000 $ 30,000<br />

Execution <strong>Plan</strong> Development & Review 1 LS $ 12,000 $ 12,000<br />

<strong>Health</strong> & <strong>Safety</strong> <strong>Plan</strong> 1 LS $ 8,000 $ 8,000<br />

Subcontractor QA/QC <strong>Plan</strong><br />

Subcontractor(s) Mobilization/<strong>Site</strong> Preparation<br />

1 LS $ 8,000 $ 8,000<br />

Mobilization 1 LS $ 25,000 $ 25,000<br />

Perimeter Air Monitoring System Installation / 3 Months Operation 3 Sta $ 3,500 $ 10,500<br />

Temporary Fencing & Delineation (6' Chn Lnk - rented) 500 LF $ 10 $ 5,000<br />

Dust Control 60 Daily $ 850 $ 51,000<br />

Stormwater Pollution <strong>and</strong> Prevention <strong>Plan</strong> 1 LS $ 30,000 $ 30,000<br />

Erosion Control / Stormwater Setup 1,500 Snd Bgs $ 10 $ 15,000<br />

Clearing & Grubbing (with Disposal) 2 acre $ 10,000 $ 20,000<br />

Concrete <strong>and</strong> Asphalt Removal (removal <strong>and</strong> disposal) 5,000 tons $ 50 $ 250,000<br />

Survey / Stake Excavation <strong>Plan</strong><br />

Ab<strong>and</strong>onment & Replacement of Groundwater Wells<br />

100 hours $ 300 $ 30,000<br />

Ab<strong>and</strong>onment of one "C" zone <strong>and</strong> seven "A" zone wells 370 LF $ 73 $ 27,133<br />

Labor 160 hours $ 100 $ 16,000<br />

Driller Subcontractor (7 "A" Zone Wells 1 "C" Zones Well) 370 feet $ 75 $ 27,750<br />

Labor 160 hours $ 100 $ 16,000<br />

Permitting<br />

Shoring & Dewatering<br />

16 per permit $ 200 $ 3,200<br />

Design 1 LS $ 25,000 $ 25,000<br />

Parcel 38 (2) - Soldier Pile shoring for 30 ft excavation<br />

3,600 SF $ 40 $ 144,000<br />

- Leave steel in place 220 Ton $ 900 $ 198,000<br />

- Dewatering 1 LS $ 25,000 $ 25,000<br />

Parcel 39 (3) - Soldier Pile shoring for 30 ft excavation<br />

9,000 SF $ 40 $ 360,000<br />

Parcel 39 (4) - Trench Box shoring for 10 ft excavation<br />

1 LS $ 25,000 $ 25,000<br />

Parcel 29 (5) - Trench Box shoring for 10 ft excavation<br />

Excavation & Disposal<br />

1 LS $ 25,000 $ 25,000<br />

Excavation of Impacted Soils (unsaturated only) 47,610 ton $ 15 $ 714,150<br />

Export Soils/Waste Characterization 79 1/500 CY $ 500 $ 39,675<br />

Excavation of Sloped/Non-Impacted Soils with Stockpile Mgmt (6) Loading, Transportation & Off-<strong>Site</strong> Disposal<br />

13,900 ton $ 17 $ 236,300<br />

RCRA - L<strong>and</strong> ban (0%) - ton $ 198 $ -<br />

TSCA - Direct L<strong>and</strong>fill 533 ton $ 198 $ 105,435<br />

Non-RCRA (Cal) (7) 4,561 ton $ 100 $ 456,113<br />

RCRA&TSCA - Direct L<strong>and</strong>fill - ton $ 240 $ -<br />

Non Hazardous (7) 42,715 ton $ 56 $ 2,392,026<br />

Confirmation Survey 70 hours $ 185 $ 12,950<br />

Field Labor (cleanup field effort, 4 FTEs, 33 weeks) 5,280 hours $ 100 $ 528,000<br />

Air Monitoring Samples (Cr6+, Arsenic, PM10)<br />

On-<strong>Site</strong> Stabilization<br />

70 3/Sta/Day $ 120 $ 8,400<br />

Mobilization 1 LS $ 10,000 $ 10,000<br />

RCRA Soil Processing 2,200 ton $ 27 $ 59,400<br />

Cal-Haz Soil Processing 1,990 ton $ 29 $ 57,710<br />

Confirmation Sampling 42 1/100 ton $ 500 $ 20,950<br />

J-3<br />

361