(9/3/08)<br />
2 Details soil gas monitoring wells construction<br />
<strong>and</strong> sampling frequency <strong>and</strong> their action levels<br />
during the O & M plan will be required after the<br />
excavation activities are completed.<br />
Comments from Bruce Garbaccio, Geologist General Comments<br />
1 Section 7.6.2 Confirmation Sampling - They<br />
should reference EPA Method 5035 for field<br />
preservation in this section. The text indicates<br />
the rate of sampling for bottom samples, but<br />
does not for sidewall samples.<br />
2 Figure 5-1 Soil Hazardous Waste<br />
Classifications - They have included a map<br />
showing areas with waste designation for<br />
disposal (TSCA, RCRA, Cal-Haz, etc.) as we<br />
had requested.<br />
3 Figure 7-1 Bottom Confirmation Sampling<br />
Locations – The proposed bottom confirmation<br />
sampling looks good.<br />
4 Figure 7-2 Sidewall Confirmation Sampling<br />
Locations – The proposed sidewall<br />
confirmation sampling looks good with a few<br />
exceptions. Based on Figure 7-2, the spacing<br />
between 033-PC-001 <strong>and</strong> -013 is approximately<br />
40 feet. The spacing between 033-PC-028 <strong>and</strong><br />
-031 is approximately 48 feet. The spacing<br />
Response – Comment noted. The O&M <strong>Plan</strong> will include well construction<br />
information, soil gas sampling frequency, <strong>and</strong> specific action level language.<br />
Response – The RAP has been modified to reflect the use of EPA Method 5035 for<br />
field preservation. In addition, the following sentence has been added to indicate the<br />
rate of sampling for sidewalls. (Note: this sentence appeared in Section 5 <strong>and</strong> will also<br />
be included in Section 7.)<br />
“Per DTSC (2008e) request, sidewall samples will be collected at a rate of one sample<br />
per 20 to 30 linear feet of sidewall, where safety considerations <strong>and</strong> accessibility<br />
allow.”<br />
Response – Comment noted. No changes to the RAP are required.<br />
Response – Comment noted. No changes to the RAP are required.<br />
Response – Comment noted. Figure 7-2 of the RAP has been modified to include the<br />
requested additional sidewall confirmation sampling.<br />
Page 2 of 5<br />
368