(9/3/08)<br />

2 Details soil gas monitoring wells construction<br />

<strong>and</strong> sampling frequency <strong>and</strong> their action levels<br />

during the O & M plan will be required after the<br />

excavation activities are completed.<br />

Comments from Bruce Garbaccio, Geologist General Comments<br />

1 Section 7.6.2 Confirmation Sampling - They<br />

should reference EPA Method 5035 for field<br />

preservation in this section. The text indicates<br />

the rate of sampling for bottom samples, but<br />

does not for sidewall samples.<br />

2 Figure 5-1 Soil Hazardous Waste<br />

Classifications - They have included a map<br />

showing areas with waste designation for<br />

disposal (TSCA, RCRA, Cal-Haz, etc.) as we<br />

had requested.<br />

3 Figure 7-1 Bottom Confirmation Sampling<br />

Locations – The proposed bottom confirmation<br />

sampling looks good.<br />

4 Figure 7-2 Sidewall Confirmation Sampling<br />

Locations – The proposed sidewall<br />

confirmation sampling looks good with a few<br />

exceptions. Based on Figure 7-2, the spacing<br />

between 033-PC-001 <strong>and</strong> -013 is approximately<br />

40 feet. The spacing between 033-PC-028 <strong>and</strong><br />

-031 is approximately 48 feet. The spacing<br />

Response – Comment noted. The O&M <strong>Plan</strong> will include well construction<br />

information, soil gas sampling frequency, <strong>and</strong> specific action level language.<br />

Response – The RAP has been modified to reflect the use of EPA Method 5035 for<br />

field preservation. In addition, the following sentence has been added to indicate the<br />

rate of sampling for sidewalls. (Note: this sentence appeared in Section 5 <strong>and</strong> will also<br />

be included in Section 7.)<br />

“Per DTSC (2008e) request, sidewall samples will be collected at a rate of one sample<br />

per 20 to 30 linear feet of sidewall, where safety considerations <strong>and</strong> accessibility<br />

allow.”<br />

Response – Comment noted. No changes to the RAP are required.<br />

Response – Comment noted. No changes to the RAP are required.<br />

Response – Comment noted. Figure 7-2 of the RAP has been modified to include the<br />

requested additional sidewall confirmation sampling.<br />

Page 2 of 5<br />

368