Table J-2<br />

South Region High School #9 <strong>and</strong> Middle School #4 Operable Unit (OU) 1<br />

Alternative 3 (Excavation, On-<strong>Site</strong> Stabilization, Off-<strong>Site</strong> Disposal)<br />

Summary of Cost Estimate<br />

(6) Non-impacted soil excavated during the remedial action, including soil excavated to allow sloping back of the excavation, will be<br />

used as backfill to restore the site to final grade.<br />

(7) For costing purposes, it was assumed that the RCRA-hazardous waste would be stabilized to California-hazardous waste levels <strong>and</strong><br />

that California-hazardous waste would be stabilized to non-hazardous waste. This would be dependent upon the results of the<br />

treatability testing<br />

(8) Utility protection assumes only temporary "in-place" protection of underground utilities will be required, but does not include rerouting<br />

of underground utilities. Utility protection in Adella Avenue includes an active gas line within the excavation footprint <strong>and</strong>,<br />

therefore, this utility protection has a highest associated cost..<br />

(9) Backfill costs include placement of approximately 800 cy of cement bentonite slurry at the base of the 30-foot deep excavation at<br />

Parcel 39.<br />

(10) Due to the complications of backfilling between 30 <strong>and</strong> 18 ft bgs (i.e., below the "A1" groundwater), it is assumed gravel will be<br />

used as backfill from the excavation bottom (30 ft bgs) to 18 ft bgs.<br />

(11) Under Installation of SVE Piping" <strong>and</strong> "Construction of Treatment Pad", does not include capital costs for purchase of treatment<br />

systems (other than installation of piping runs) or costs for operation <strong>and</strong> maintenance of SVE treatment system. Construction of<br />

concrete pad includes cost for installation of underground water line <strong>and</strong> electrical conduit to pad.<br />

J-5<br />

363