LAUSD Proposed South Region High School #9 & Middle School #4<br />
3.0 TEAM ORGANIZATION<br />
3-1<br />
December 2006<br />
<strong>Site</strong> <strong>Specific</strong> <strong>Health</strong> & <strong>Safety</strong> <strong>Plan</strong> (<strong>HASP</strong>)<br />
The key Parsons personnel assigned to the LAUSD include a Project Manager (PM), a Field<br />
Team Manager, <strong>and</strong> a <strong>Site</strong> <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Officer (SHSO). The Parsons team assigned to the<br />
project, their responsibilities, <strong>and</strong> lines of authority are outlined below (Table 3-1).<br />
Table 3-1: Key Personnel<br />
Task Assigned Name<br />
Project Manager Jim Goepel<br />
Project <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Manager Josh Sacker, PG<br />
Pasadena Facility <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Kristin Guthrie<br />
Representative<br />
Field Team Manager Josh Sacker, PG<br />
<strong>Site</strong> <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Officer Kristin Guthrie<br />
The PM is directly responsible for the execution of all phases of this project. The PM also is<br />
responsible for planning, staffing, ensuring quality assurance/quality control (QA/QC), executing<br />
each phase of the work, coordinating with the client, interpreting data, <strong>and</strong> reporting. The PM<br />
will also ensure that each task <strong>and</strong> project is covered under this <strong>HASP</strong>. The PM will ensure<br />
preparation of an <strong>HASP</strong> addendum for tasks not covered in the <strong>HASP</strong>, including identification of<br />
specific site activity <strong>and</strong>/or conditions <strong>and</strong> preparation, review, <strong>and</strong> completion of an activity<br />
hazard analysis (AHA) for those activities. The PM will be responsible for ensuring that a<br />
subcontractor’s health <strong>and</strong> safety requirements are based on LAUSD, the California<br />
Occupational <strong>Safety</strong> <strong>and</strong> <strong>Health</strong> Administration (Cal/OSHA), <strong>and</strong> project health <strong>and</strong> safety<br />
requirements. The PM will communicate potential site hazards to all Parsons subcontractors.<br />
The Project <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Manager <strong>and</strong> Pasadena Facility <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Representative<br />
(FHSR) will be responsible for updating <strong>and</strong> revising the <strong>HASP</strong>, as needed. The PM <strong>and</strong> FHSR<br />
also are responsible for ensuring that all field team members meet health <strong>and</strong> safety training <strong>and</strong><br />
medical monitoring requirements.<br />
The Field Team Manager <strong>and</strong> SHSO will support the PM for the specific work that will be<br />
accomplished at the <strong>Site</strong> <strong>and</strong> will be responsible for scheduling <strong>and</strong> coordinating the field<br />
activities at the <strong>Site</strong>. The Field Team Manager will assist the PM in the <strong>org</strong>anization <strong>and</strong><br />
execution of health <strong>and</strong> safety requirements for project tasks. The SHSO will ensure that all<br />
field activities are performed with strict adherence to Cal/OSHA requirements, this <strong>HASP</strong>, <strong>and</strong><br />
any <strong>HASP</strong> addenda. The SHSO has the authority to stop work if actions or conditions are judged<br />
to be unsafe or not in conformance with this <strong>HASP</strong> or an addendum to the <strong>HASP</strong>.<br />
All LAUSD project team members are responsible for reading <strong>and</strong> conforming to this <strong>HASP</strong>.<br />
No employee shall perform a project activity that he or she believes may endanger his or her<br />
health <strong>and</strong> safety or the health <strong>and</strong> safety of others. Team members should report any unsafe or<br />
unhealthful situation or condition to the SHSO <strong>and</strong>/or field team manager. If a team member<br />
prefers, <strong>and</strong> if the concern is not an emergency, concerns may be reported anonymously to the<br />
Corporate <strong>Health</strong> <strong>and</strong> <strong>Safety</strong> Manager.<br />
Subcontractors are responsible for the health <strong>and</strong> safety of their employees.<br />