Table J-1<br />

South Region High School #9 <strong>and</strong> Middle School #4 Operable Unite (OU) 1<br />

Alternative 2 (Excavation <strong>and</strong> Off-<strong>Site</strong> Disposal)<br />

Summary of Cost Estimate<br />

CLEANUP - Operable Unit 1 (North of Tweedy Blvd) Quantity (1)<br />

Geotechnical Engineering Consultant<br />

Units Cost per Unit Total Cost<br />

Review of Test Results <strong>and</strong> <strong>Plan</strong>s 80 hours $ 120 $ 9,600<br />

Field Oversight 160 hours $ 120 $ 19,200<br />

Compaction Testing<br />

Backfill & Compaction<br />

1 LS $ 25,000 $ 25,000<br />

Field Oversight 1 LS $ 25,000 $ 25,000<br />

Import Soil (LAUSD, DTSC <strong>Specific</strong>ations) (8) 47,610 ton $ 23 $ 1,095,030<br />

Soil Import Geotechnical / Chemical Analysis 20 1/2000 CY $ 1,000 $ 19,838<br />

Parcel 38 Backfill with gravel up to 18 ft bgs (9) 1,500 CY $ 50 $ 75,000<br />

Backfill & Compaction (import soil <strong>and</strong> sloped/non-impact soil) 59,260 ton $ 15 $ 888,900<br />

Contingency Measures<br />

Field Labor <strong>and</strong> Oversight (all contingency measures) 440 hours $ 120 $ 52,800<br />

Vapor Monitoring Wells (7 sets of multiple screened wells) 420 linear ft $ 100 $ 42,000<br />

Groundwater Monitoring Wells (2 "A"-zone wells) 90 linear ft $ 100 $ 9,000<br />

Impermeable Vertical Vapor Membrane (materials & application) 9,000 sq. ft $ 5 $ 45,000<br />

Installation of SVE Piping (10)<br />

350 linear ft $ 75 $ 26,250<br />

Construction of Treatment Pad, including Utilities (10)<br />

1 LS $ 20,000 $ 20,000<br />

<strong>Site</strong> Restoration<br />

Interim Cover - Hydroseed 1 LS $ 200,000 $ 200,000<br />

Regrade <strong>Site</strong> 11,095 SY $ 3 $ 29,586<br />

Demobilization 1 LS $ 25,000 $ 25,000<br />

Closure Report (includes compaction report) 1 LS $ 150,000 $ 150,000<br />

GENERAL CLEANUP - Operable Unit 1 (North of Tweedy Blvd) $ 9,088,364<br />

General Conditions<br />

Project Management/Construction Administration/Technical Eval. 15 % $ 1,363,255<br />

Escalation 5 % $ 454,418<br />

Contingency 15 % $ 1,363,255<br />

Markup Total $ 3,180,927<br />

TOTAL GENERAL CLEANUP COSTS POST MARKUP $ 12,269,292<br />

Notes:<br />

(1) Estimated quantities (i.e., number of units) used are based on the current underst<strong>and</strong>ing of site condition; during implementation of the remedy,<br />

actual ( ) quantities p may vary due to the field conditions or logistical gconsiderations encountered during remediation. p ( g ) p p<br />

6 feet apart (not 6 feet on-center), <strong>and</strong> wood lagging will be installed on soldier piles to a depth of 30 feet along a 120 ft section. Steel beams will be<br />

left in place after the excavation ("sacrificed"). For excavation to 30 ft bgs (below "A1" zone groundwater occurring at ~19 ft bgs) at Parcel 38,<br />

dewatering will be required. For cost estimating, it is a assumed dewatering will involve pumping, containment, <strong>and</strong> disposal of 11,000 gallons of<br />

"A1" zone groundwater.<br />

(3) Soldier piles will be as described above (30-inch dia boreholes at 6 ft spacing, with steel I-beams to 65 ft bgs, <strong>and</strong> lagging to 30 ft bgs), except<br />

that the steel I-beams will be removed from the 30-ich dia boreholes (steel will be re-used), <strong>and</strong> lagging will be installed along a 300 ft section.<br />

(4) Trench box shoring will be installed to allow excavation to 10 ft bgs along a 100 ft section of the property.<br />

(5) Trench box shoring will be installed to allow excavation to 10 ft bgs along a 100 feet section of the property.<br />

(6) Non-impacted soil excavated during the remedial action, including soil excavated to allow sloping back of the excavation, will be used as backfill<br />

to restore the site to final grade.<br />

(7) Utility protection assumes only temporary "in-place" protection of underground utilities will be required, but does not include re-routing of<br />

underground utilities. Utility protection in Adella Avenue includes an active gas line within the excavation footprint <strong>and</strong>, therefore, this utility protection<br />

has a highest associated cost.<br />

(8) Backfill costs include placement of approximately 800 cy of cement bentonite slurry at the base of the 30-foot deep excavation at Parcel 39.<br />

(9) Due to the complications of backfilling between 30 <strong>and</strong> 18 ft bgs (i.e., below the "A1" groundwater), it is assumed gravel will be used as backfill<br />

from the excavation bottom (30 ft bgs) to 18 ft bgs.<br />

(10) Under Installation of SVE Piping" <strong>and</strong> "Construction of Treatment Pad", does not include capital costs for purchase of treatment systems (other<br />

than installation of piping runs) or costs for operation <strong>and</strong> maintenance of SVE treatment system.<br />