01.03.2014 Aufrufe

KONGRESSUNTERLAGEN | PROCEEDINGS - Bft-international.com

KONGRESSUNTERLAGEN | PROCEEDINGS - Bft-international.com

KONGRESSUNTERLAGEN | PROCEEDINGS - Bft-international.com

MEHR ANZEIGEN
WENIGER ANZEIGEN

Sie wollen auch ein ePaper? Erhöhen Sie die Reichweite Ihrer Titel.

YUMPU macht aus Druck-PDFs automatisch weboptimierte ePaper, die Google liebt.

Kongressunterlagen ← PODIUM 3<br />

spalling occurs on the finished surface, for example on concrete<br />

steps in front of the building entrance, with a significant adverse<br />

effect on appearance.<br />

Such precast elements are subject to <strong>com</strong>plaints although it is<br />

undisputed that they do not exceed the scaling limit of 1,500 g/<br />

m² specified in the standard. The consulted expert counted 150 of<br />

these spots per square meter with a mean diameter of 8 mm and<br />

a depth of 1 mm.<br />

The fact that such a missing tiny concrete “cover” weighs only<br />

about 0.2 g means that only a total of 30 g is reached. Assuming<br />

further that the surface shows a scaling rate to an overall mean<br />

depth of 0.3 mm, this adds another 700 g/m², resulting in a total<br />

scaling of 730 g/m² (i.e. clearly below the threshold of 1,500 g/m²).<br />

The concrete or installed precast element <strong>com</strong>plies with the<br />

agreed standard with respect to scaling, and thus meets the contractually<br />

agreed conditions. The element is fully fit for its intended<br />

purpose, and the scaling process <strong>com</strong>es to a halt. The surfaces<br />

do not look appealing.<br />

This issue is also dealt with in the 4/2011 DBV Code of Practice<br />

for concrete bridge perimeter elements, where “usual quantities”<br />

for which no repair is necessary are mentioned. A distinction is<br />

made between three local imperfection categories:<br />

»»<br />

- pop-outs (swelling of isolated aggregate particles due to water<br />

absorption, frost action or exposure to de-icing salts)<br />

»»<br />

- organic constituents (e.g. wood or coal)<br />

»»<br />

- spalling above intact (mostly smooth and level, near-surface)<br />

aggregate particles<br />

In this field, too, there is still disagreement among experts with<br />

respect to the number of “permissible” imperfections.<br />

Technical options to reduce their number include:<br />

»»<br />

preventing pop-outs/organic contamination: limiting the permissible<br />

share in the aggregate in excess of the standard specifications<br />

as far as such material is (locally) available<br />

»»<br />

measures to prevent spalling above flat, solid aggregates:<br />

»»<br />

avoiding smooth hard-rock aggregates<br />

»»<br />

reducing the maximum particle size<br />

»»<br />

preventing the accumulation of air or water below aggregate<br />

particles in the production process and<br />

»»<br />

nsuring early, thorough finishing/surface treatment<br />

→ 2 Massive tread<br />

Blockstufe<br />

»»<br />

Popouts (Quellen einzelner Gesteinskörner infolge Wasseraufnahme,<br />

Frost oder Frosttausalz)<br />

»»<br />

organische Bestandteile (z. B. Holz, Kohle o. ä.)<br />

»»<br />

Ablösung über gesunden (meist glatten und ebenen oberflächennahen)<br />

Gesteinskörnern<br />

Auch hier herrscht in der Fachwelt noch keine Einigkeit über diese<br />

Anzahl an „zulässigen“ Fehlstellen.<br />

Technisch zu reduzieren:<br />

»»<br />

Maßnahme gegen Popouts/organische Bestandteile: Begrenzung<br />

der zulässigen Mengen im Gestein über Norm hinaus, soweit derartiges<br />

Material (lokal) verfügbar<br />

»»<br />

Maßnahmen gegen Ablösungen über flachen festen Steinen:<br />

»»<br />

Vermeiden von glatten Hartgesteinen,<br />

»»<br />

Verminderung des Größtkorns,<br />

»»<br />

Vermeiden von Luft- oder Wasseransammlung unter Gesteinskörnern<br />

bei der Produktion und<br />

»»<br />

frühzeitige und intensive Nachbehandlung<br />

i-PBS Enterprise Suite<br />

Die Softwarelösung für die Produktions- und Logistikplanung in der Betonfertigteilindustrie<br />

Try IT!<br />

VertriebAuslastungsplanungProjektsteuerung<br />

ProduktionssteuerungLagermanagementVersandMontage<br />

Production • Business • Solutions<br />

i-PBS Production Business Solutions GmbH | Gudrunstraße 184|4 | 1100 Wien | www.i-pbs.at | office@i-pbs.at

Hurra! Ihre Datei wurde hochgeladen und ist bereit für die Veröffentlichung.

Erfolgreich gespeichert!

Leider ist etwas schief gelaufen!