23.02.2013 Views

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11. SPECIAL PROJECTS<br />

11.1 Introduction<br />

Apart from projects identified in the various sections of the ITP and<br />

consolidated in the Implementation <strong>Plan</strong> - Section 13, there is a category of<br />

projects that qualify as Special Projects. These are 1) The People Mover<br />

System and 2) projects primarily focussed on meeting transport needs for<br />

the 2010 FIFA World Cup.<br />

11.2 The People Mover Project<br />

This project is planned as a tourist focussed public transport system and<br />

service in the <strong>Durban</strong> CBD, connecting key activity centres in that area of<br />

the City.<br />

The existing public transport system and services to the <strong>Durban</strong> CBD serve<br />

the needs of daily commuters and the introduction of a prioritised public<br />

transport CBD distribution system, Project 7 in the Implementation <strong>Plan</strong>, will<br />

significantly enhance public transport services for commuters with CBD<br />

origins/destinations.<br />

Whilst this system provides a measure of mobility in the CBD for tourists, it<br />

does not focus specifically on the needs of this group.<br />

The concept of the People Mover System is to provide the alternative of an<br />

upmarket system and service with levels of convenience, comfort and<br />

security expected by tourists travelling in any first world city throughout the<br />

world. The objective then is to ensure tourists can reach various interest<br />

and activity destinations in the CBD using such a public transport system.<br />

11.2.1 Phased Implementation<br />

It is intended to develop and implement the<br />

People Mover System on a phased basis.<br />

Various concepts have been considered for<br />

the long term including monorail type vehicles<br />

operating on dedicated right-of-way.<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

11.1<br />

Special Projects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!