6.4 Programme Summary by Category<br />
Table 6.7 shows a summary of estimated capital expenditure by project<br />
category in the short term five year programme and from 2010 to 2020.<br />
Table 6.7 Roads Programme Expenditure Estimate to Year 2020<br />
Category Focus No of<br />
Projects<br />
Expenditure Est. (R millions)<br />
2005/06 - 2009/10 Post 2010<br />
1. Accessibility 20 545 610<br />
2. Freight (1)<br />
3. Safety, Bottleneck Removal & Economic<br />
Development<br />
4. Public <strong>Transport</strong> (2)<br />
2 33 -<br />
32 651 382<br />
4 122 25<br />
5. Capacity 19 631 1104<br />
6. Roads Projects to Support Key City Projects (3)<br />
2 40 2000<br />
TOTAL PROGRAMME 79 2022 4121<br />
Note 1) Additional projects will be identified on completion of future phases of the Freight <strong>Plan</strong><br />
2) Additional projects will be identified for Post 2010 as detailed planning of PT system progresses<br />
3) Additional projects could be identified in support of future Key City Projects<br />
6.5 FIFA World Cup 2010<br />
Current planning and identified projects related to this event are discussed<br />
in Section 11. As the planning progresses the transport infrastructure<br />
requirements in support of this major event are being identified. These<br />
projects will be developed in an integrated process and incorporated into<br />
the ITP.<br />
Roads<br />
programme<br />
summary<br />
eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />
Summary Report<br />
6.8<br />
Road <strong>Plan</strong> Proposals