Table 13.2 is a summary of the municipal budget allocation to each<br />

transport sector for each of the five years in the short term programme. In<br />

terms of the programme cost estimates municipal expenditure on public<br />

transport would increase from approximately R23 million in Year one to<br />

R107 million in Year 5 an increase from 9% of the total budget to 34%.<br />

This expenditure excludes the considerable expenditure from national<br />

government on upgrade and expansion of rail service in the North-South<br />

Corridor, a commitment essential to the roll out of related public transport<br />

projects funded by the Municipality in Years 3 to 5.<br />

Table 13.3 is a summary of all expenditure required from the Municipal<br />

capex budget plus funding from other sources including private and public<br />

sectors.<br />

During the five year short term programme a major investment in rail is<br />

needed and expected from national funding augmented by considerable<br />

Municipal investment in support of the development of a cost effective,<br />

efficient public transport system. The only other transport sector where<br />

external funding is expected is the roads programme where 37% of the<br />

funding is expected from NDOT, KZNDOT and the private sector.<br />

Increased<br />

expenditure on<br />

public transport<br />

Total expenditure<br />

in 5 year prog.<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

13.7<br />

Implementation <strong>Plan</strong> 2005-2010