Ref<br />
No<br />
5 Year Programme Requirements (R millions) Expected<br />
Cost Est Current Funding<br />
Project Category and Description (R mill) 04/05 05/06 06/07 07/08 08/09 09/10 Total Source<br />
87<br />
Booth Rd (M32) Spine Rd to<br />
Francois Rd<br />
50.0 50.0 Metro<br />
88<br />
Francois Rd (M32) - Booth Rd to<br />
University<br />
8.0 8.0 Metro<br />
89 D403 Ext - Inanda to R102 Verulam 10.0 10.0 Metro<br />
90<br />
91<br />
92<br />
93<br />
94<br />
North Coast Rd (R102) Upgrade -<br />
Verulam to Phoenix<br />
South Coast Rd (R102) from<br />
Bayhead to M7<br />
North Coast Rd through Mt<br />
Edgecombe<br />
Umhlanga Rocks Dr/Northway<br />
Intersection<br />
Improved connections from<br />
Newlands W. Dr. (M23) to MR577<br />
25.0 25.0 Metro<br />
4.0 4.0 Metro<br />
15.0 15.0 Metro<br />
5.0 5.0 Metro<br />
5.0 5.0 Metro<br />
95 Inanda Rd (M21) at NPC factory 8.0 8.0 Metro<br />
96 Inanda Arterial West 70.0 70.0 Metro<br />
97 Inanda Arterial East 70.0 70.0 Metro<br />
98<br />
La Mercy I/c on N2 freeway with link<br />
to R102, as part of new King Shaka<br />
airport & iDube Tradeport<br />
Roads Projects - Summary<br />
CAPITAL PROJECTS - SUMMARY<br />
40.0 20.0 20.0 NRA/KZNDOT<br />
From Mun. Capex Budget 186.6 164.5 300.7 330.0 227.0 1208.8<br />
Other Funding 205,0 230,0 150,0 47.0 20.0 652.0<br />
Roads Total 391.6 394.5 450.7 377.0 247.0 1860.8<br />
From Mun. Capex Budget 236.3 255.9 415.1 470.3 383.8 1761.4<br />
Other Funding 217.6 389.5 324.4 237.5 140.0 1309.0<br />
Total Funding 453.9 645.4 739.5 707.8 523.8 3070.4<br />
13.6<br />
eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />
Summary Report<br />
Implementation <strong>Plan</strong> 2005-2010