23.02.2013 Views

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9. TRAFFIC MANAGEMENT AND CONTROL<br />

In the broadest sense urban traffic management and control comprises<br />

traffic control systems, with the integrated application of intelligent transport<br />

systems (ITS) technology and various aspects of information management<br />

and enforcement systems.<br />

The application of these systems and technologies is geared towards<br />

maximising the efficient and safe use of existing infrastructure.<br />

Section 9 of the ITP reviews the current status and development proposals<br />

in traffic management and control highlighting those aspects that form part<br />

of the Implementation <strong>Plan</strong> for the ITP.<br />

9.1 Urban Traffic Control (UTC) System<br />

The existing system is currently being upgraded as follows:-<br />

� Some 700 controllers, now in excess of twenty years old and<br />

beyond serviceable limits are being replaced.<br />

� The in-station (centralised computer)<br />

controlling some 400 signals in an area traffic<br />

control (ATC) system is being upgraded<br />

including dedicated cable connections to the<br />

outstations (traffic signal controllers).<br />

� Possible introduction to LED, high light<br />

intensity, low maintenance signal heads (over 3<br />

year period).<br />

� Real time adaptive control using the SCOOT software programme,<br />

in addition to controlling the Victoria Embankment, will be extended<br />

to include:-<br />

� Intersections at Umgeni Road and Inanda Road with<br />

the N2 service road<br />

� Argyle Road between Brickhill and Cowey Road<br />

Prioritised public transport routes under real time signal control, using BUS<br />

SCOOT software, is being considered as a pilot project; location as yet<br />

undetermined.<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

9.1<br />

Traffic Management and Control

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!