Integrated Transport Plan.pdf - Durban
Integrated Transport Plan.pdf - Durban
Integrated Transport Plan.pdf - Durban
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Plan</strong>ning projects include the development of a road based:-<br />
� Hazchem route network<br />
� Freight route network<br />
� Abnormal load network<br />
� Investigation of Truck Stop<br />
� <strong>Durban</strong> container terminal precinct (joint project: KZN<br />
province/National/ETA)<br />
Capital infrastructure roads projects that form a part of the five year ITP<br />
programme in Section 6 - Roads, include:-<br />
� The Edwin Swales Drive (M7) upgrade from the N2 freeway to<br />
Titren Road (see also Section 6.3.2 - Project 19)<br />
� Bayhead Road Extension over the Southern Freeway including<br />
the new Kongela Bridge and access to Edwin Swales Drive via<br />
Sydney and Umbilo Roads (See also Section 6.3.2 - Project 20)<br />
� Implementation of hazchem routes (planned above)<br />
In addition, the five year ITP programme will include upgraded freight<br />
management infrastructure to the extent of R5,0 million. The exact nature of<br />
the infrastructure will be defined in the next phases of the Freight <strong>Plan</strong>.<br />
Freight plan<br />
projects<br />
eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />
Summary Report<br />
8.10<br />
Freight