23.02.2013 Views

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Plan</strong>ning projects include the development of a road based:-<br />

� Hazchem route network<br />

� Freight route network<br />

� Abnormal load network<br />

� Investigation of Truck Stop<br />

� <strong>Durban</strong> container terminal precinct (joint project: KZN<br />

province/National/ETA)<br />

Capital infrastructure roads projects that form a part of the five year ITP<br />

programme in Section 6 - Roads, include:-<br />

� The Edwin Swales Drive (M7) upgrade from the N2 freeway to<br />

Titren Road (see also Section 6.3.2 - Project 19)<br />

� Bayhead Road Extension over the Southern Freeway including<br />

the new Kongela Bridge and access to Edwin Swales Drive via<br />

Sydney and Umbilo Roads (See also Section 6.3.2 - Project 20)<br />

� Implementation of hazchem routes (planned above)<br />

In addition, the five year ITP programme will include upgraded freight<br />

management infrastructure to the extent of R5,0 million. The exact nature of<br />

the infrastructure will be defined in the next phases of the Freight <strong>Plan</strong>.<br />

Freight plan<br />

projects<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

8.10<br />

Freight

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!