- Page 2 and 3:
ETHEKWINI TRANSPORT AUTHORITY INTEG
- Page 4 and 5:
TABLE OF CONTENTS TABLE OF CONTENTS
- Page 6 and 7:
8.4 FUTURE GENERATORS OF FREIGHT...
- Page 8 and 9:
1. INTRODUCTION The Integrated Tran
- Page 10 and 11:
Collectively, these perspectives on
- Page 12 and 13:
The following mission statement rec
- Page 14 and 15:
3. IDP SPATIAL FRAMEWORK, LONG TERM
- Page 16 and 17:
� Previous projections have shown
- Page 18 and 19:
3.3 Key Development Projects with t
- Page 20 and 21:
DRAFT July 2004 N3 Source: Corporat
- Page 22 and 23:
N3 Urban Edge Metro Boundary ABM’
- Page 24 and 25:
Currently some 120 000 greenfield s
- Page 26 and 27:
4. TRANSPORT DEMAND MANAGEMENT 4.1
- Page 28 and 29:
If the ‘target’ modal split is
- Page 30 and 31:
� Upgrade of the rail system and
- Page 32 and 33:
Within this context, ETA’s public
- Page 34 and 35:
No.16 To facilitate public transpor
- Page 36 and 37:
No.34 To promote public transport o
- Page 38 and 39:
5.2.2 Content of the Survey On the
- Page 40 and 41:
The metropolitan area has four majo
- Page 42 and 43:
Taxi service is provided by 120 tax
- Page 44 and 45:
Key aspects of the proposed system
- Page 46 and 47:
� Support for densification along
- Page 48 and 49:
N3 Urban Edge Metro Boundary High P
- Page 50 and 51:
No.11 The granting of an operating
- Page 52 and 53:
5.6.7 Individual Routes Evaluation
- Page 54 and 55:
5.7.2 Rail Strategy The following a
- Page 56 and 57:
A Land Use Restructuring Strategy w
- Page 58 and 59:
6. MAJOR ROAD PROPOSALS 6.1 Introdu
- Page 60 and 61: In general terms, the Council is no
- Page 62 and 63: Table 6.2 Freight Movement Focused
- Page 64 and 65: Table 6.5 Capacity Related Roads Pr
- Page 66 and 67: 7. ROAD SAFETY 7.1 Introduction Roa
- Page 68 and 69: � Heavy Vehicles � Light Delive
- Page 70 and 71: eThekwini Municipality has 15 munic
- Page 72 and 73: In summary it was found that:- �
- Page 74 and 75: Strategy 15: Create a smaller dedic
- Page 76 and 77: Enforcement: Engineering: Strategy
- Page 78 and 79: 2005 CAMPAIGN KEY COMPONENTS RESPON
- Page 80 and 81: 7.8 Institutional Arrangements Some
- Page 82 and 83: Table 7.4: Road Safety Action Progr
- Page 84 and 85: ACTIVITIES RESPONSIBILITY WHEN COST
- Page 86 and 87: ACTIVITIES RESPONSIBILITY WHEN COST
- Page 88 and 89: ACTIVITIES RESPONSIBILITY WHEN COST
- Page 90 and 91: 8.2.2 The Road System The eThekwini
- Page 92 and 93: Table 8.2 Annual Truck Freight Tonn
- Page 94 and 95: 8.3.6 Durban Airport Freight Moveme
- Page 96 and 97: 8.5.2.2 Port Access Container Termi
- Page 98 and 99: Planning projects include the devel
- Page 100 and 101: Variable message signing (VMS) curr
- Page 102 and 103: 10.3 Development of a Rural Transpo
- Page 104 and 105: The capital and operating cost alon
- Page 106 and 107: Other related projects include:-
- Page 108 and 109: Table 12.1 Transport Infrastructure
- Page 112 and 113: 13. IMPLEMENTATION PLAN 2005-2010 1
- Page 114 and 115: Table 13.1 eThekwini Integrated Tra
- Page 116 and 117: Ref No 5 Year Programme Requirement
- Page 118 and 119: Table 13.2 is a summary of the muni
- Page 120 and 121: 13.4 Long Term Context for Short Te
- Page 122 and 123: 14. MONITORING STRATEGY & KPI’s 1
- Page 124 and 125: Section of ITP 7. Road Safety (Cont