� Upgrade of the rail system and service through continued<br />

pursuance of investment in the rail system and infrastructure.<br />

� Modernisation of the bus and taxi fleets.<br />

� A CBD prioritised public transport distribution system which<br />

would interface with the various major bus, rail and taxi services<br />

to the CBD.<br />

� A pilot project for co-ordinated, integrated feeder services to rail.<br />

� Upgrade of the area traffic control system (ATC) which in central<br />

<strong>Durban</strong> optimises traffic flows and reduces congestion and<br />

related pollution.<br />

� Phased implementation of taxi and bus rank rationalisation in<br />

<strong>Durban</strong>’s Warwick Avenue area; developing towards a multi-level<br />

Berea station transport interchange.<br />

� An investigation to identify congestion locations along the public<br />

transport routes and evaluate possible options to reduce or avoid<br />

congestion<br />

� A pilot study for upgrading public transport security at selected<br />

rank (s).<br />

� A parking investigation to consider more efficient use of available<br />

parking facilities and develop a comprehensive parking<br />

revenue/cost recovery programme, taking into consideration the<br />

cost of providing and maintaining facilities.<br />

� Although not a project as such, policy has been developed for<br />

this first ITP giving priority to public transport in the planning and<br />

development of the transportation system and in support of<br />

appropriate TDM measures to minimise the negative impact of<br />

private transport on the urban environment.<br />

Completion of pilot projects will undoubtedly give rise to other projects with<br />

some of these being incorporated into the TDM strategy at a later stage in<br />

the planning process.<br />

Rail system<br />

upgrade<br />

Bus/taxi fleet<br />

modernisation<br />

PT priority<br />

distribution in<br />

the CBD<br />

<strong>Integrated</strong><br />

feeders to rail<br />

Warwick Ave<br />

taxi/bus rank<br />

rationalisation<br />

PT congestion<br />

alleviation<br />

Pilot: PT rank<br />

security<br />

Policy<br />

supporting<br />

public<br />

transport<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

4.5<br />

Traffic Management and Control<br />

ATC<br />

upgrade<br />

Parking<br />

investigation