� Upgrade of the rail system and service through continued<br />
pursuance of investment in the rail system and infrastructure.<br />
� Modernisation of the bus and taxi fleets.<br />
� A CBD prioritised public transport distribution system which<br />
would interface with the various major bus, rail and taxi services<br />
to the CBD.<br />
� A pilot project for co-ordinated, integrated feeder services to rail.<br />
� Upgrade of the area traffic control system (ATC) which in central<br />
<strong>Durban</strong> optimises traffic flows and reduces congestion and<br />
related pollution.<br />
� Phased implementation of taxi and bus rank rationalisation in<br />
<strong>Durban</strong>’s Warwick Avenue area; developing towards a multi-level<br />
Berea station transport interchange.<br />
� An investigation to identify congestion locations along the public<br />
transport routes and evaluate possible options to reduce or avoid<br />
congestion<br />
� A pilot study for upgrading public transport security at selected<br />
rank (s).<br />
� A parking investigation to consider more efficient use of available<br />
parking facilities and develop a comprehensive parking<br />
revenue/cost recovery programme, taking into consideration the<br />
cost of providing and maintaining facilities.<br />
� Although not a project as such, policy has been developed for<br />
this first ITP giving priority to public transport in the planning and<br />
development of the transportation system and in support of<br />
appropriate TDM measures to minimise the negative impact of<br />
private transport on the urban environment.<br />
Completion of pilot projects will undoubtedly give rise to other projects with<br />
some of these being incorporated into the TDM strategy at a later stage in<br />
the planning process.<br />
Rail system<br />
upgrade<br />
Bus/taxi fleet<br />
modernisation<br />
PT priority<br />
distribution in<br />
the CBD<br />
<strong>Integrated</strong><br />
feeders to rail<br />
Warwick Ave<br />
taxi/bus rank<br />
rationalisation<br />
PT congestion<br />
alleviation<br />
Pilot: PT rank<br />
security<br />
Policy<br />
supporting<br />
public<br />
transport<br />
eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />
Summary Report<br />
4.5<br />
Traffic Management and Control<br />
ATC<br />
upgrade<br />
Parking<br />
investigation