Table 7.4: Road Safety Action Programme Engineering Sector<br />

ACTIVITIES RESPONSIBILITY WHEN COST (R) FUNDING<br />

SOURCE<br />

A. GENERAL<br />

1. Annual business plans for<br />

funding:<br />

� eThekwini Municipality –<br />

Engineering projects/traffic<br />

calming<br />

� Asiphephe – hazloc<br />

program<br />

� Arrive Alive – Overtime<br />

and booze bus<br />

(enforcement<br />

2. Develop a comprehensive road<br />

safety information system which<br />

will include risk assessment,<br />

engineering, enforcement,<br />

education and accident data<br />

3. Develop a hazchem plan for<br />

eThekwini<br />

4. Organize an eThekwini Road<br />

Safety Indaba and HERO<br />

awards function to recognize<br />

persons who have made<br />

outstanding contributions to the<br />

community in the field of Road<br />

Safety. Invite all sectors.<br />

� Annual meeting of the<br />

eThekwini Road Safety<br />

Council<br />

5. Include Road Safety in annual<br />

eThekwini Quality of Life survey<br />

B. SECTOR: ENGINEERING<br />

a: BASICS<br />

6. Indicate funding and projects<br />

for coming year<br />

7. Capture Road Safety Projects<br />

for database<br />

8. Develop a standardized<br />

� network screening<br />

procedure<br />

� prioritization procedure<br />

9. Carry out before-and-after<br />

studies on implementation<br />

projects.<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

10. All new plans to be audited eThekwini <strong>Transport</strong> Authority:<br />

Road Safety Branch<br />

b: AREA WIDE<br />

11. Carry out formal area-wide eThekwini <strong>Transport</strong> Authority:<br />

HAZLOC programme:<br />

� Road Safety Branch<br />

� using standardized network � Engineering Branch<br />

screening procedure<br />

� using standardized<br />

prioritization procedure<br />

� list of projects for funding in a<br />

particular year<br />

� audits and assessments of<br />

priority hazlocs<br />

Annually n/a<br />

October to February 2005 ETA<br />

February to April 2005 R120 000<br />

Still to be<br />

confirmed<br />

Annual event<br />

October, first meeting in<br />

October 2006<br />

Annual, Develop question<br />

in 2005 and target 2006<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

7.17<br />

Road Safety<br />

ETA<br />

n/a<br />

Annually n/a<br />

ongoing n/a<br />

2005<br />

(from 2006 onwards,<br />

engineering projects will<br />

go through the<br />

standardized procedure)<br />

R60 000<br />

To be<br />

confirmed<br />

ongoing project<br />

specific<br />

ETA<br />

ETA<br />

ongoing internal n/a<br />

Annual, BUSINESS PLAN<br />

(in time to put forward<br />

projects for funding from<br />

the various sources)