Integrated Transport Plan.pdf - Durban
Integrated Transport Plan.pdf - Durban
Integrated Transport Plan.pdf - Durban
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The capital and operating cost along with the complexity of implementing<br />
such systems preclude introducing such technology and levels of<br />
sophistication in the short term. Consequently, as an interim 3 year<br />
solution, a pilot system will be introduced based on the use of state-of-theart<br />
midibus vehicles operating in mixed traffic along defined routes in the<br />
CBD.<br />
Ten such vehicles with seated capacity of 35 will be<br />
used to provide this service. These vehicles will be<br />
fully air-conditioned, with a spacious seating<br />
configuration, and fully accessible for wheel chair<br />
passengers. CCTV camera surveillance on-board<br />
and at terminals will ensure a high level of personal<br />
security.<br />
Tenders have been received for the system vehicles which will be owned<br />
by eThekwini Municipality. The service will be operated under contract to<br />
the Municipality, and it is anticipated that a functional system will be<br />
operational before year end.<br />
11.3 2010 FIFA World Cup Projects<br />
Various transport projects form part of the transportation<br />
strategy for the 2010 Soccer World Cup. Apart from<br />
meeting the transport needs of this event benefits for the<br />
City overall will be realised both before and after the<br />
event.<br />
11.3.1 Location of the Stadium<br />
Based on an assessment of various criteria Kings Park<br />
was selected as the best location for the World Cup<br />
event. Assessment criteria included:-<br />
� Minimise total origin-destination travel distance<br />
� Minimise total travel time<br />
� Ability to connect to high capacity public transport network and<br />
modes<br />
� Impact on long term usage patterns<br />
� Requirements to be fully operational within the planning period<br />
eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />
Summary Report<br />
11.2<br />
Special Projects