23.02.2013 Views

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

Integrated Transport Plan.pdf - Durban

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The capital and operating cost along with the complexity of implementing<br />

such systems preclude introducing such technology and levels of<br />

sophistication in the short term. Consequently, as an interim 3 year<br />

solution, a pilot system will be introduced based on the use of state-of-theart<br />

midibus vehicles operating in mixed traffic along defined routes in the<br />

CBD.<br />

Ten such vehicles with seated capacity of 35 will be<br />

used to provide this service. These vehicles will be<br />

fully air-conditioned, with a spacious seating<br />

configuration, and fully accessible for wheel chair<br />

passengers. CCTV camera surveillance on-board<br />

and at terminals will ensure a high level of personal<br />

security.<br />

Tenders have been received for the system vehicles which will be owned<br />

by eThekwini Municipality. The service will be operated under contract to<br />

the Municipality, and it is anticipated that a functional system will be<br />

operational before year end.<br />

11.3 2010 FIFA World Cup Projects<br />

Various transport projects form part of the transportation<br />

strategy for the 2010 Soccer World Cup. Apart from<br />

meeting the transport needs of this event benefits for the<br />

City overall will be realised both before and after the<br />

event.<br />

11.3.1 Location of the Stadium<br />

Based on an assessment of various criteria Kings Park<br />

was selected as the best location for the World Cup<br />

event. Assessment criteria included:-<br />

� Minimise total origin-destination travel distance<br />

� Minimise total travel time<br />

� Ability to connect to high capacity public transport network and<br />

modes<br />

� Impact on long term usage patterns<br />

� Requirements to be fully operational within the planning period<br />

eThekwini <strong>Integrated</strong> <strong>Transport</strong> <strong>Plan</strong><br />

Summary Report<br />

11.2<br />

Special Projects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!