Page 7.1-8<br />
Revision: 2<br />
August 2011<br />
<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
b. When bundles, crates, cartons, boxes, etc. are opened following delivery, another check must<br />
be performed to determine the quantity received and their condition.<br />
If during this inspection damages or shortages of items are found upon opening the crates or cartons, a written<br />
claim should be sent to the carrier no later than fourteen (14) days after delivery. If a shortage is discovered<br />
within a container, then a written notice should be mailed to RIGID at the same time the claim is sent to the<br />
carrier.<br />
Unless these two important inspections are made and any reports or claims are fi led immediately, settlements<br />
become very diffi cult and usually all parties suffer the loss.<br />
NOTE:<br />
Even when RIGID trucks are involved in the delivery, careful attention should be paid to the material, and<br />
claims fi led in the same timely manner.<br />
When fi ling claims either with the carrier, or with RIGID, the claim should indicate the item(s) in question, the<br />
bundle or container in question (if any), the actual quantity received, the quantity which should have been<br />
received, or that which was damaged. This is important for quickly retrieving the necessary information. Also,<br />
other information such as numbers, names and addresses of consignees and consignors should be indicated<br />
on claims, as well as invoice numbers.<br />
These procedures are primarily for your protection. A shortage discovered later, can be caused by theft.<br />
misplacement. or other causes, and neither the carrier or RIGID can accept responsibility.<br />
NOTE:<br />
Galvanized and galvalume materials are susceptible to damage from prolonged periods of contact with moisture<br />
while stacked together. If there is evidence of moisture during unloading, the panels should be separated,<br />
dried and stored out of the weather to prevent permanent discoloration. Never install any material if its’ quality<br />
is in question!<br />
2.3 LOCATION OF BUILDING PARTS<br />
• Columns and rafters are usually unloaded near their respective installed positions on blocking on<br />
the slab in position for easy makeup.<br />
• Endwalls are usually laid out at each end of slab with the columns near respective anchor bolts.<br />
NOTE!<br />
An access area through the center of the building should be left for erection equipment.<br />