5.7 ALIGNING THE GIRTS<br />

Installation of the building walls is generally done before the roof. Before starting the wall installation, check<br />

to be sure that the eave strut and girts are straight and plumb. One method of aligning the girts is to cut temporary<br />

wood blocking to the proper length and install between the lines of girts.. This blocking can be moved<br />

from bay to bay which will reduce the number of pieces required. Normally, one line of blocking per bay will<br />

be suffi cient. Banding can also be used to hold the girls straight and plumb.<br />

NOTE:<br />

Temporary girt blocking is not recommended on concealed<br />

fastener panels. The removal of the the block after panel intallation<br />

will cause oil canning.<br />

NOTE:<br />

Do not allow blocking tobecome a falling hazard.<br />

Workers should wear OSHA approved hard-hats.<br />

Girts should never be used as a climbing ladder.<br />

Damage to girl clips, as well as injury to worker<br />

may result. Safety fi rst!<br />

wood blocking<br />

Wood blocking could a 2 x 4 wood, cut to girt spacing length. Refer to the cross section or wall framing<br />

elevations drawing to determine the girt spacing.<br />

Technical information contained herein is subject to change without notice. Page 7.1-51<br />

Revision: 2<br />

April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!