Page 7.1-62<br />
Revision: 2<br />
August 2011<br />
<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
Along the top of the closures that have been placed along the eave, apply a second run of tape mastic.<br />
Prior to removing paper backing, check and mark for proper alignment of the fi rst roof panel.. Note<br />
that self-tapping screws will require holes be drilled in the supporting structure prior to installation.<br />
Continue mastic and closure run along eave in preparation for the next roof panel.<br />
INSULATION<br />
DOUBLE SIDED TAPE<br />
WALL FASTENER<br />
EAVE STRUT<br />
INSULATION<br />
CUT <strong>AND</strong> FOLD INSULATION<br />
TAPE SEALANT<br />
* Outside closure is optional<br />
INSIDE CLOSURE<br />
EAVE TRIM<br />
(SHAPE MAY VARY)<br />
WALL FASTENER<br />
OUTSIDE CLOSURE<br />
WALL PANEL<br />
CAULK CLOSURE SPLICE<br />
WHEN ICE & SNOW AT EAVE<br />
MAY OCCUR<br />