5.10 INSTALLATION OF WALL PANELS<br />
Adjoining panels are installed with the pre-drilled overlapping rib toward the last erected panel. Position<br />
panel to structural making sure that it is kept plumb. Drill structural if required and install fasteners at<br />
lapped rib. Check for proper coverage and correct as necessary. Install remaining fasteners. Note that<br />
clearance holes in overlapping rib must be pre-drilled.<br />
WALL<br />
PANEL<br />
WOOD<br />
BLOCKING<br />
BLANKET<br />
INSULATION<br />
NOTE:<br />
Wear OSHA approved eye protection when operating drill. Electric tools must be properly<br />
grounded. Do not use electrical equipment while standing on wet surfaces. Safety fi rst!<br />
Technical information contained herein is subject to change without notice. Page 7.1-57<br />
Revision: 2<br />
April 2011