26.03.2013 Views

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

5.18 ROOF SHEETING SEQUENCE<br />

It is recommended that both sides of the ridge of a building be sheeted simultaneously. This will keep the<br />

insulation covered for the maximum amount of time and the panel ribs can be kept in proper alignment for<br />

the ridge panel. Check for proper coverage as the sheeting progresses. Note panel sheeting sequence<br />

below!<br />

NOTE:<br />

If oil or other slippery substances are present on the roof panels, wipe them clean<br />

immediately to prevent slipping or falling. Workers should maintain a constant<br />

awareness of their location relative to the roof edge. Use OSHA approved tie<br />

offs, netting’s or rails when working on roof surfaces. Safety fi rst!<br />

Technical information contained herein is subject to change without notice. Page 7.1-69<br />

Revision: 2<br />

April 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!