<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
6.1 GUTTER INSTALLATION<br />
Position Gutter<br />
so exposed edge<br />
is factory cut<br />
2”<br />
1/2”<br />
Field cut<br />
notch<br />
(2) 3/16”<br />
dia. beads<br />
Tube Sealant<br />
Gutter<br />
EAVE GUTTER SPLICE<br />
Technical information contained herein is subject to change without notice. Page 7.1-75<br />
Revision: 2<br />
April 2011<br />
1/2”<br />
2”<br />
Gutter<br />
1/8” dia. Rivets<br />
@ front, bottom<br />
& back of Gutter<br />
Layout the gutter assemblies before installation on the roof. Start and fi nish the gutter ends as shown on next page.