26.03.2013 Views

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

6.1 GUTTER INSTALLATION<br />

Position Gutter<br />

so exposed edge<br />

is factory cut<br />

2”<br />

1/2”<br />

Field cut<br />

notch<br />

(2) 3/16”<br />

dia. beads<br />

Tube Sealant<br />

Gutter<br />

EAVE GUTTER SPLICE<br />

Technical information contained herein is subject to change without notice. Page 7.1-75<br />

Revision: 2<br />

April 2011<br />

1/2”<br />

2”<br />

Gutter<br />

1/8” dia. Rivets<br />

@ front, bottom<br />

& back of Gutter<br />

Layout the gutter assemblies before installation on the roof. Start and fi nish the gutter ends as shown on next page.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!