26.03.2013 Views

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

ERECTION AND SAFETY MANUAL - Rigid Global Buildings

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Page 7.1-34<br />

Revision: 2<br />

August 2011<br />

<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />

TYPICAL SECONDARY FRAMING CONNECTION DETAILS<br />

RIGID FRAME COLUMN<br />

GIRT<br />

RIGID FRAME COLUMN<br />

GIRT CLIP<br />

BY-PASS GIRT WITH 3” LAP<br />

FLUSH GIRT<br />

1/2” DIA. A307 BOLTS<br />

1/2” DIA. A307 BOLTS<br />

INTERIOR BAY PURLIN / GIRT FRAMING<br />

NOTE:<br />

The 3” lap requires four (4) 1/2” dia. bolts. The fl ush girt connection requires two (2) or<br />

four (4) 1/2” diameter blots. <strong>SAFETY</strong> FIRST!<br />

Technical information contained herein is subject to change without notice.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!