ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
ERECTION AND SAFETY MANUAL - Rigid Global Buildings
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>ERECTION</strong> <strong>AND</strong> <strong>SAFETY</strong> <strong>MANUAL</strong><br />
The template panel should be laid out for the proper screw locations in accordance with the building erection<br />
drawings. Since pre-drilling will “hand” the panels, it will also be necessary to select the end of the building<br />
from which the paneling is to begin. Before drilling the template panel. it should be checked for oroper hole<br />
locations against the building framework. Be sure there is no excessive defl ection in the purlins and girts.<br />
Page 7.1-50<br />
Revision: 2<br />
August 2011<br />
3/4"<br />
3/4"<br />
1 7/8"<br />
VARIES<br />
1 1/2"<br />
1 1/2"<br />
VARIES<br />
1"<br />
PURLIN WEB<br />
LAP<br />
NOTE:<br />
DIMENSIONS SUBJECT TO VARIATIONS,<br />
CHECK BUILDING <strong>ERECTION</strong><br />
Technical information contained herein is subject to change without notice.